SK318 Block Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Shell
  • Country: Malaysia
  • Location: Sarawak
  • Production start: 2023
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • There are two developments on the block, Timi and Rosmari-Marjoram
  • Timi is designed to produce up to 50,000 barrels of oil equivalent per day of gas at peak production using an unmanned platform and will evacuate its gas through a new 80 kilometres (km) pipeline to the F23 production hub.

Contractors

  • -

History

  • 2022 - FID for Rosmari-Marjoram
  • 2023 - First gas from Timi

Geology

Links