Petrojarl I FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The vessel is 215 metres long and has deadweight of 31,473 tons
  • It can process 46,000 bpd of oil and ahndle 47,000 bpd of water whilst having 190,000 barrels of storage
  • The process system comprises crude separation and stabilization.
  • Since the delivery in 1986, various oil companies have contracted the ship for oil production. The field locations have been in the British and Norwegian sectors of the North Sea.
  • It will next be used on the Atlanta Oil Field

+++ Contractors

  • **NKK:** Vessel construction
  • **Inocean:** Design
  • **Kværner:** Installation of two specially-built turbines to generate electricity from associated gas
  • **ABB:** Electrical Systems
  • **Emerson:** Control systems
  • Wärtsilä: dual-fuel engines to meet the power production requirements

+++ Status

  • Undergoing upgrading before the next operation

+++ History

  • 1986 - The "Petrojarl I" was built by NKK in Japan
  • 2000 - PGS signs contract with Statoil for the Glitne field
  • 2001 - Production on Glitne field starts
  • 2003 - Contract for Glitne Field extended
  • 2014 - Vessel contracted for the Atlanta Field

+++ Other Information

+++ Links

  1. ABB FPSO References
  2. Emerson FPSO References
  3. Inocean FPSO References
  4. Wärtsilä FPSO References
  5. PGS Announces New FPSO Contract
  6. Petrojarl I on Glitne
  7. PGS FPSO Petrojarl I Starts Production on the Glitne Field
  8. Extended Contract for PGS FPSO Petrojarl I on the Glitne Field
  9. Teekay Offshore Awarded New FPSO Contract for Petrojarl I FPSO and Agrees to Acquire Knarr FPSO
  10. Teekay Petrojarl contracts Damen Shiprepair Rotterdam for the ‘EPC Redeployment Upgrade’ of its FPSO Petrojarl I
  11. FPSO Petrojarl I dry-docked at Damen Shiprepair Rotterdam for EPC Redeployment Upgrade