Summary Information

  • Operator: Mubadala
  • Country: Malaysia
  • Location: Block SK 320 offshore
  • Production start: 2022
  • Partners: Mubadala, Petronas, Shell
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept comprises of an Integrated Central Processing Platform (ICPP) consisting of an 8-legged jacket.
  • The facility is designed for gas throughput of 550 million standard cubic feet of gas per day plus condensate.
  • The produced fluids are evacuated through a new 38 inch subsea pipeline tying into an existing offshore network and subsequently to the onshore Malaysia LNG plant in Bintulu.

Contractors

  • Sapura Fabrication: Engineering, Procurement, Construction, Installation & Commissioning (EPCIC)

History

  • 2018 - Final investment decision taken
  • 2022 - First gas produced

Geology