Peciko Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Total
  • Country: Indonesia
  • Location: Offshore Mahakam Block -3.36
  • Production start: 1999
  • Partners: Total - 50%, Inpex - 50%
  • Type: Gas & Condensate
  • Estimated Reserves: 6.2 trillion cubic feet (tcf)
  • Production Volume:

+++ Description

  • Peciko gas field is located offshore from the Mahakam river delta, on the East Kalimantan
  • The gas is transported through a 25-kilometer pipeline to an onshore processing plant in the Senipah area, where the gas undergoes preprocessing before being transmitted to the Bontang LNG Terminal through an 80-kilometer pipeline for liquefaction.
  • Phase 1 included 2 production platforms

+++ Contractors

  • **Punj Lloyd:** Phase 4 - Engineering, procurement and supply of materials, construction, pre-commissioning and commissioning assistance for two gas compression trains at onshore plant at Senipah on EPC basis, with a gas capacity of 450 MMSCFD for each train
  • **PT Nippon Steel Construction Indonesia:** EPCI Contract to construct and install one offshore SWP-F platform (3,400 ton) and subsea pipeline (20” x 4.7km) for Peciko Phase 5
  • **Saipem:** Field Development Phase IV (PCK 4 EPSC2) - platforms and sealines

+++ History

  • 1997 - PSC signed
  • 1999 - First gas produced

+++ Geology

+++ Links

  1. Indonesia Exploration And Production Blocks
  2. Punj Lloyd Refining References
  3. Saipem Pipeline References
  4. Saipem Fixed Offshore Production Facilities Project References
  5. Total inaugurates Peciko gas field in East Kalimantan
  6. PT Nippon Steel Construction Indonesia is awarded for Peciko by Total E&P Indonesie