Summary Information
- Operator: Total
- Country: Nigeria
- Location: Oil Mining Lease (OML) 102
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The platform weighs approximately 13,000 tons and it is 54m long, 47m wide and 30m high. This platform can produce an amount of 105,000 barrels of crude petroleum and 3 million m³ of natural gas
- The associated gas of the Ofon field is compressed, evacuated to shore to the [[[Nigeria LNG Terminal]]]
+++ Contractors
- **HHI** Offshore fixed platform
- **McDermott:** Construction of four-level production deck
- **Technip:** Loading, transport and installation of the topsides for the OFP2 fixed platform
- **JDR:** Two five kilometre length subsea power cables, in addition to topside termination equipment and connection boxes
- **Saipem:** OFP2
- Living Quarters - Basic Engineering
- Modifications and Tie-in Activities - Detail Engineering
+++ History
- 2007 - HHI awarded contract for offshore fixed platform
- 2012 - Total launches Phase 2 Development of Offshore Ofon Field
- 2015 - Compression project completed, and flaring ended
+++ Geology
+++ Links
- Hyundai Heavy Industries Platform References
- McDermott Platform References
- Saipem Saipem Fixed Offshore Production Facilities Major Projects
- Saipem Fixed Offshore Production Facilities Engineering Refe
- Nigeria: Total launches Phase 2 Development of Offshore Ofon Field
- HHI Wins a $520 Million Platform Order from Nigeria
- JDR Awarded Subsea Power Cable Contract For Total Ofon Field
- Technip awarded contract for the loading, transport and installation of a production platform in Nigeria
- Nigeria: Total achieves flare-out on its operated Ofon field