Nizhny Novgorod Refinery Coker Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary: Apart from a delayed coker, the complex, with the total annual feed rate of 2.1 million tons, features a diesel hydrotreater, a gas fractionator, hydrogen and sulfur production units, as well as infrastructure facilities. Once the new facility is commissioned, the Nizhny Novgorod refinery will significantly reduce its production of fuel oil, increase refinery yield up to 95.5% and achieve higher synergy with the fluidized catalytic-cracking units already in operation. As a result, the yield of light petroleum products will grow from the actual 64% up to 76%.
  • Main Contractors
    • CB&I: detailed engineering, procurement and supply of process equipment, including two proprietary delayed coking heaters
    • Kinetics Technology: EPC contracts for the Diesel Fuel Hydrotreater Unit, a Hydrogen Production Unit, a Pressure Swing Adsorption (PSA) unit as well as a Gas Fractionation Unit and a Sulphur Recovery Unit.
    • Chevron Lummus Global's (CLG): Delayed coking technology

Refining Units

  • Delayed coker
  • Diesel hydrotreater,
  • gas fractionator,
  • Hydrogen production unit
  • Sulphur production unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • The construction of the complex and related operations optimization will improve the refinery's light product yield by more than 10% while reducing the fuel oil production by 2.7 million tonnes per annum

History

  • 2017 - Final investment decision taken
  • 2017 - CB&I awarded EPC contract
  • 2018 - Construction started
  • 2022 - Project completed

Other Information

-

Links

  1. Kinetics Technology Refinery References
  2. Lukoil Takes Final Investment Decision On Delayed Coker At Nizhny Novgorod Refinery
  3. CB&I Announces Engineering, Procurement and Supply Award for LUKOIL
  4. Lukoil Starts Construction Of Petroleum Residue Recycling Facility At Nizhny Novgorod Refinery
  5. Two EPC contracts worth USD 527 MN awarded by Lukoil in the refining business
  6. McDermott Awarded EPC Contract for Delayed Coker Unit for LUKOIL Refinery
  7. Lukoil Commissions Petroleum Residue Recycling Facility at Its Nizhny Novgorod Refinery