K08 and K11 Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: NAM
  • Country: Netherlands
  • Location: North Sea
  • Production start: 1977
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • These fields are part of the [[[Netherlands Joint Development Area Gas Fields]]]
  • The development consists of the following platforms
    • K8-FA-1 - integrated platform
    • K8-FA-2 & K8-FA-3- satellite platforms
    • K8-FA-1P - accommodation platform

+++ Contractors

  • **Seaway Heavy Lifting:** Transport & Installation of the K8-FA-1 Accommodation platform
  • **SLP:**
    • K81 Gas Compression Module
    • K8-FA-1 Accommodation platform
  • **HSM Offshore:** K8-FA-1 Compression Module
  • **Emtunga:** K-8 - Single-lift quarters


+++ History

  • 1977 - First two platforms installed
  • 1984 - Second satellite platform installed
  • 2001 - Accommodation Platform installed
  • 2011 - Talisman acquires a share from Vattenfall


+++ Geology

+++ Links

  1. Platforms Netherlands Continental Shelf
  2. FoundOcean Subsea References
  3. Emtunga Europe Offshore Platform References
  4. Seaway Heavy Lifting Oil And Gas References
  5. International Protective Coatings Platform References
  6. HSM Offshore Platform References
  7. Tullow to enhance Dutch portfolio through acquisition of Nuon E&P