G16a Gas Fields
Jump to navigation
Jump to search
Summary Information
- Operator: Neptune
- Country: Netherlands
- Location: 80km north of Dutch Island Terschelling
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The G16-A Wellhead Platform utilised the old K12-E topsides
- Platform G16a-B has a water separation facility but frther treatment of the gas takes place on platform G17d-AP to which the satellite is connected by pipeline
+++ Contractors
- **Mercon Steel Structures:** Manufacturing of a 1,250 tonnes topside and a 950 tonnes jacket including piles (580 tonnes) for Platform G16a-B
- **Seaway Heavy Lifting:** Installation of the G16-A Wellhead Platform & G16a-B Platform
+++ History
- 2009 - G16a C Gas Field discovered
- 2010 - Mercon awarded contract for Platform G16a-B
- 2011 - First gas produced from G16a C
- 2018 - Neptune acquires Engie's stake
+++ Geology
+++ Links
- [[[Seaway Heavy Lifting Oil And Gas References]]]
- GDF SUEZ awards platform to Mercon
- Start-up of a gas production in the Netherlands
- Neptune Energy completes the acquisition of ENGIE E&P International SA