Daria Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Italy
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field utilises 2 platforms, Daria A & B

+++ Contractors

  • **Tecon:** Complete structural design - Daria B
  • **Saipem:** EPC - Daria B

+++ History

  • 1995 - Daria B installed

+++ Geology

+++ Links

  1. Offshore Platforms in Italy
  2. Tecon Platform References
  3. Saipem Europe Fixed Offshore Production Facilities Project R