Cabinda Refinery Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Gemcorp
  • Website:
  • Wiki Page:
  • Location: Malembo plain, 30 kilometers north of the capital of Cabinda, Angola
  • Capacity: 3.0 million tons/annum & 60,000 bbl/day
  • Nelson Complexity:
  • Project Stage: FID
  • Expected Completion: 2022 (Phase 1)
  • Budget: $ 920 million

The Project

  • Project Type: A greenfield refinery
  • Project Summary:
    • The 1st phase of the Project is expected to include 30,000 barrels per day of the Crude Distillation Unit, with a desalinator, kerosene treatment and auxiliary infrastructure, including a conventional float anchoring system, pipelines and storage facility for more than 1.2 million barrels.
    • First phase expenses are approximately US $ 220 million (two hundred and twenty million US dollars).
    • The 2nd and 3rd phases will turn the Cabinda Refinery into a total conversion refinery, with an additional refining capacity of 30,000 barrels per day and the installation of a new catalytic reformer, hydrotreater and catalytic cracking unit, which should total USD 700,000. 000 (seven hundred million US dollars).
  • Main Contractors
  • Licences

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation
  • Catalytic reformer
  • Hydrotreater
  • catalytic cracking unit,

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

-

History

  • 2020 - Final

Other Information

-

Links

  1. FINAL INVESTMENT DECISION TAKEN FOR CONSTRUCTION OF THE CABINDA REFINERY