Aura Oil And Gas Processing References
Jump to navigation
Jump to search
References
- Liwan 3-1 Gas Field
- China
- CNOOC
- 4x12000kW - WHRU
3x8000kW
Fired boiler
CPE IRAQ Halfay
Phase I
4x12000kW (3x41 MBtu/h) (Gas fired)
CNOOC Indonesia Sumatra Gas Field 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
CNOOC QHD326 FPSO
12000kW (41 MBtu/h) (Heavy Oil fired) Shanghai Petro-chemical, Polyester Production
2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired) SINOPEC Yanshan Petro-chemical
2x6100kW (2x21 MBtu/h) (Gas fired) CNPC (International) Sudan Fula Oil Field
- Luda 27-2 And LD 32-2 Oil Fields
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (WHRU)
2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired)
PDOC Sudan Block3-7
- Kela-2 Gas Field
- China
- CNPC
- 2x6700kW (2x23 MBtu/h) (Gas fired)
- Qinhuangdao Offshore Oil Field
- Nanbao Offshore Oil Field
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
- Bozhong 28-2S Oil Fields
- China
- CNOOC
- 3x6000kW (3x20 MBtu/h) (WHRU)