− | Summary Information | + | === Summary Information === |
− | * Ownership: | + | * Ownership: NSMP |
− | * Website: https://www. | + | * Website: https://www.nsmp-limited.com/ |
* Location: Teesside, UK | * Location: Teesside, UK | ||
− | * Capacity: | + | * Capacity: 675 million cubic feet of gas per day |
− | + | === Brief Description === | |
* The Teesside Gas Processing Plant consists of two gas processing trains with a combined capacity to process up to 675 million cubic feet of gas per day | * The Teesside Gas Processing Plant consists of two gas processing trains with a combined capacity to process up to 675 million cubic feet of gas per day | ||
* Natural gas processed in TGPP originates from oil and gas fields in the North Sea. It is transported to the Teesside Gas Processing Plant via the [[CATS Central Area Transmission System Gas Pipeline]] and from the [[Breagh A Gas Field | Breagh pipeline]] | * Natural gas processed in TGPP originates from oil and gas fields in the North Sea. It is transported to the Teesside Gas Processing Plant via the [[CATS Central Area Transmission System Gas Pipeline]] and from the [[Breagh A Gas Field | Breagh pipeline]] | ||
− | + | ==== Related Oil and Gas Fields ==== | |
* [[Andrew Oil and Gas Field]], | * [[Andrew Oil and Gas Field]], | ||
* [[Armada Oil and Gas Field]] | * [[Armada Oil and Gas Field]] | ||
Line 20: | Line 20: | ||
* [[Marnock Oil Field]] | * [[Marnock Oil Field]] | ||
− | + | === Ongoing Projects === | |
* - | * - | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === History === | |
* 1993 - The plant was commissioned | * 1993 - The plant was commissioned | ||
* 2013 - Breagh & Jasmine come onstream | * 2013 - Breagh & Jasmine come onstream | ||
+ | * 2013 - NSMP acquired the plant | ||
− | + | === Links === | |
+ | # [https://www.nsmp-limited.com/our-assets/teeside-gas-processing-plant/ Teesside Gas Processing Plant, NSMP] | ||
# [http://killajoules.wikidot.com/archive:rwe-dea-uk-starts-production-from-the-breagh-gas-fie RWE Dea UK starts production from the Breagh gas field] | # [http://killajoules.wikidot.com/archive:rwe-dea-uk-starts-production-from-the-breagh-gas-fie RWE Dea UK starts production from the Breagh gas field] | ||
# [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field] | # [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/teesside-gas-processing-plant-limited.html Teesside Gas Processing Plant Limited acquired by North Sea Midstream Partners] | ||
+ | |||
+ | [[category:Processing]] | ||
+ | [[category:UK]] | ||
+ | [[category:NSMP]] |
Revision as of 10:49, 8 May 2024
Contents
Summary Information
- Ownership: NSMP
- Website: https://www.nsmp-limited.com/
- Location: Teesside, UK
- Capacity: 675 million cubic feet of gas per day
Brief Description
- The Teesside Gas Processing Plant consists of two gas processing trains with a combined capacity to process up to 675 million cubic feet of gas per day
- Natural gas processed in TGPP originates from oil and gas fields in the North Sea. It is transported to the Teesside Gas Processing Plant via the CATS Central Area Transmission System Gas Pipeline and from the Breagh pipeline
Related Oil and Gas Fields
- Andrew Oil and Gas Field,
- Armada Oil and Gas Field
- Breagh A Gas Field
- Everest Oil and Gas Field
- Jasmine Gas and Condensate Field
- Judy, Joanne and Jade Gas and Condensate Fields
- Lomond Oil and Gas Field
- Marnock Oil Field
Ongoing Projects
- -
Other Information
- -
History
- 1993 - The plant was commissioned
- 2013 - Breagh & Jasmine come onstream
- 2013 - NSMP acquired the plant