Difference between revisions of "Zohr Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
* Location: Shorouk Block, Egypt’s Offshore Mediterranean | * Location: Shorouk Block, Egypt’s Offshore Mediterranean | ||
* Production start: 2017 | * Production start: 2017 | ||
− | * Partners: ENI | + | * Partners: ENI 50%, Rosneft 30%, BP 10%, Mubadala Petroleum 10% |
* Type: Gas | * Type: Gas | ||
* Estimated Reserves: 850 BCM, (about 5.5 billion barrels of oil equivalent) | * Estimated Reserves: 850 BCM, (about 5.5 billion barrels of oil equivalent) | ||
Line 16: | Line 16: | ||
=== Contractors === | === Contractors === | ||
− | Offshore | + | * Offshore |
− | Aker Solutions: Supply of 180 kilometers of steel tube umbilicals | + | ** Aker Solutions: Supply of 180 kilometers of steel tube umbilicals |
− | OneSubsea: six horizontal subsea trees, intervention and workover control systems, landing string, tie-in, high-integrity pressure protection system, topside and subsea controls and distribution, water detection and salinity monitoring, and installation and commissioning services. | + | ** OneSubsea: six horizontal subsea trees, intervention and workover control systems, landing string, tie-in, high-integrity pressure protection system, topside and subsea controls and distribution, water detection and salinity monitoring, and installation and commissioning services. |
− | Gas Processing plant | + | ** Saipem: transportation, installation and pre-commissioning of 170 km of umbilicals |
− | Kinetics Technology: Engineering & Procurement) contract, supplying two modularized Sulphur Recovery Units complete with Claus, Tail Gas Treatment (TGT) and Acid Gas Enrichment (AGE) sections | + | * Gas Processing plant |
− | Control Platform | + | ** Kinetics Technology: Engineering & Procurement) contract, supplying two modularized Sulphur Recovery Units complete with Claus, Tail Gas Treatment (TGT) and Acid Gas Enrichment (AGE) sections |
− | Petrobel: Fabrication, Load out & sea-fastening | + | * Control Platform |
+ | ** Petrobel: Fabrication, Load out & sea-fastening | ||
+ | |||
+ | |||
=== History === | === History === | ||
− | 2014 - ENI awarded the licence for Shorouk Block | + | * 2014 - ENI awarded the licence for Shorouk Block |
− | 2015 - Zohr gas field discovered | + | * 2015 - Zohr gas field discovered |
− | 2016 - FID for the project | + | * 2016 - FID for the project |
− | 2016 - Aker soultions awarded umbilicals contract | + | * 2016 - Aker soultions awarded umbilicals contract |
− | 2016 - BP acquired 10% of the field | + | * 2016 - BP acquired 10% of the field |
− | 2017 - Rosneft acquired 30% of the field | + | * 2017 - Rosneft acquired 30% of the field |
− | 2018 - Second and third production units started | + | * 2017 - First gas produced |
+ | * 2018 - Second and third production units started | ||
+ | * 2018 - Mubadala Petroleum acquired a 10% stake | ||
+ | |||
=== Geology === | === Geology === | ||
− | Early-Middle Miocene limestones | + | * Early-Middle Miocene limestones |
+ | |||
=== Links === | === Links === | ||
# [http://petrojet.com.eg/project/zohr-control-platform/ Petrobel: Zohr Control Platform] | # [http://petrojet.com.eg/project/zohr-control-platform/ Petrobel: Zohr Control Platform] | ||
Line 45: | Line 52: | ||
# [http://killajoules.wikidot.com/archive:zohr-ramp-up:eni-starts-up-the-third-production-unit Zohr Ramp-up: Eni starts up the third production unit] | # [http://killajoules.wikidot.com/archive:zohr-ramp-up:eni-starts-up-the-third-production-unit Zohr Ramp-up: Eni starts up the third production unit] | ||
# [http://killajoules.wikidot.com/archive:zohr-ramp-up:eni-reaches-2-bcfd-production-target Zohr Ramp-up: Eni reaches 2 bcfd production target] | # [http://killajoules.wikidot.com/archive:zohr-ramp-up:eni-reaches-2-bcfd-production-target Zohr Ramp-up: Eni reaches 2 bcfd production target] | ||
+ | # [https://abarrelfull.blogspot.com/2021/06/eni-sells-to-mubadala-petroleum-10.html Eni sells to Mubadala Petroleum a 10% stake in the Shorouk concession, offshore Egypt] | ||
+ | # [https://abarrelfull.blogspot.com/2023/04/saipem-awarded-new-offshore-contracts.html Saipem awarded new offshore contracts for a total amount of approximately 1.2 billion USD] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Egypt]] | ||
+ | [[category:ENI]] |
Latest revision as of 08:25, 13 April 2023
Summary Information
- Operator: ENI
- Country: Egypt
- Location: Shorouk Block, Egypt’s Offshore Mediterranean
- Production start: 2017
- Partners: ENI 50%, Rosneft 30%, BP 10%, Mubadala Petroleum 10%
- Type: Gas
- Estimated Reserves: 850 BCM, (about 5.5 billion barrels of oil equivalent)
- Production Volume: 2 bcfd, equivalent to approximately 365,000 boed
Description
- Zohr, a super giant field, is the largest gas discovery ever made in Egypt and in the Mediterranean Sea. Initial estimates were for 30 TCF of reserves
- The field lies area of the field is 231 km2 , its in-place reserves exceed 850 bcm
- Development of the field entailed a long subsea connection to an onshore gas processing plant. The field is controlled by a shallow water platform.
- The field is expected to produce 2.7 bcfd per day at peak production
Contractors
- Offshore
- Aker Solutions: Supply of 180 kilometers of steel tube umbilicals
- OneSubsea: six horizontal subsea trees, intervention and workover control systems, landing string, tie-in, high-integrity pressure protection system, topside and subsea controls and distribution, water detection and salinity monitoring, and installation and commissioning services.
- Saipem: transportation, installation and pre-commissioning of 170 km of umbilicals
- Gas Processing plant
- Kinetics Technology: Engineering & Procurement) contract, supplying two modularized Sulphur Recovery Units complete with Claus, Tail Gas Treatment (TGT) and Acid Gas Enrichment (AGE) sections
- Control Platform
- Petrobel: Fabrication, Load out & sea-fastening
History
- 2014 - ENI awarded the licence for Shorouk Block
- 2015 - Zohr gas field discovered
- 2016 - FID for the project
- 2016 - Aker soultions awarded umbilicals contract
- 2016 - BP acquired 10% of the field
- 2017 - Rosneft acquired 30% of the field
- 2017 - First gas produced
- 2018 - Second and third production units started
- 2018 - Mubadala Petroleum acquired a 10% stake
Geology
- Early-Middle Miocene limestones
Links
- Petrobel: Zohr Control Platform
- Eni discovers a supergiant gas field in the Egyptian offshore, the largest ever found in the Mediterranean Sea
- Eni completes the authorization process for the development of Zohr gas field
- Aker Solutions Wins Order for Umbilicals at Egypt's Zohr Offshore Gas Field
- OneSubsea Awarded Subsea Production Systems Contract for the Zohr Development, Offshore Egypt
- BP buys 10% interest in Egypt’s super-giant Zohr gas field
- Rosneft Closes the Deal to Acquire a 30% Stake in Zohr Gas Field
- Zohr Development Project - Egypt
- Eni begins producing from Zohr, the largest ever discovery of gas in the Mediterranean Sea
- Zohr Ramp-up: Eni starts up the third production unit
- Zohr Ramp-up: Eni reaches 2 bcfd production target
- Eni sells to Mubadala Petroleum a 10% stake in the Shorouk concession, offshore Egypt
- Saipem awarded new offshore contracts for a total amount of approximately 1.2 billion USD