Difference between revisions of "Yanos Yaroslavl Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Slavneft Website: http://www.slavneft.ru/ Location: Yaroslavl Capacity: 14 million tons/annum & 280,000 bbl/day Nelson Complexity: 5.3 Refining...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Slavneft
+
* Ownership: Slavneft
Website: http://www.slavneft.ru/
+
* Website: http://www.slavneft.ru/  
Location: Yaroslavl
+
* Location: Yaroslavl
Capacity: 14 million tons/annum & 280,000 bbl/day
+
* Capacity: 14 million tons/annum & 280,000 bbl/day
Nelson Complexity: 5.3
+
* Nelson Complexity:
Refining Units
+
=== Refining Units ===
CDU
+
* CDU
VDU
+
* VDU
FCC
+
* FCC
Catalytic Reforming
+
* Catalytic Reforming
Hydrocracker
+
* Hydrocracker
Diesel Desulphurisation Unit
+
* Diesel Desulphurisation Unit
Isomerization Unit - 600,000 tpa - 2011
+
* Isomerization Unit - 600,000 tpa - 2011
Alkylation Unit
+
* Alkylation Unit
Visbreaking Unit
+
* Visbreaking Unit
Bitumen Unit
+
* Bitumen Unit
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
Refined Products:
+
* Refined Products:
Crude Supply
+
=== Crude Supply ===
 
-
 
-
Products Produced
+
=== Products Produced ===
From January 2012, the Refinery, intends to stop producing motor fuels, which do not conform to the Euro-4/ Euro-5 environmental standards
+
 
Ongoing Projects
+
* Since January 2012, all of the fuels produced at the refinery conform to the Euro-4/ Euro-5 environmental standards
See [[Yanos Yaroslavl Refinery Upgrading Project]]
+
=== Projects ===
Currently, the company is construction of a primary oil refining capacity of 4 million tons per year, which is scheduled to conclude in early 2010. The start up of the facility will enable decommissioning of obsolete units for primary refining.
+
*  In 2012 a major project to increase refining depth and improve product quality was completed
At the beginning of 2010 also reconstructed the hydrotreatment of diesel CL-24 / 7 with commissioning of facilities for the production of hydrogen, thereby producing at the site diesel Euro-4 standard.
+
* The project including the construction of Hydrocracking, Visbreaking, Catalytic Reforming, Isomerization and  
In addition, under the investment program for 2010-2013. plant to be built hydrotreatment of fractions of catalytic cracking gasoline and complete construction of an isomerization unit faction Isomalk.
+
Cat-Cracked Gasoline Hydrotreatment Units
These projects will produce high-quality gasolines that meet the standards of Euro-5.
+
* See [[Yanos Yaroslavl Refinery Upgrading Project]]
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
1952: The Soviet government decided to build a refinery in Yaroslavl.
+
* 1952: The Soviet government decided to build a refinery in Yaroslavl.
1961: Start the first stage of the plant.
+
* 1961: Start the first stage of the plant.
1966 Start of construction of a catalytic cracking unit
+
* 1966 Start of construction of a catalytic cracking unit
1995 The company became part of a vertically integrated oil company Slavneft.
+
* 1995 The company became part of a vertically integrated oil company Slavneft.
 
September 2004: Visbreaking Unit commissioned
 
September 2004: Visbreaking Unit commissioned
2005: YANOS was first among Russian oil refinery in the production of gasoline Premium Euro-95 "and the diesel fuel with sulfur content of 50 ppm (the level of Euro-4).
+
* 2005: YANOS was first among Russian oil refinery in the production of gasoline Premium Euro-95 "and the diesel fuel with sulfur content of 50 ppm (the level of Euro-4).
2005 - Vacuum gas oil hydrocracking unit commissioned
+
* 2005 - Vacuum gas oil hydrocracking unit commissioned
2006 - Catalytic reforming unit put into operation
+
* 2006 - Catalytic reforming unit put into operation
2007 - The company launched a new product - an environmentally clean diesel fuel in accordance with the specification E 590 N ultra sulfur content of 10 ppm (the level of Euro-5).
+
* 2007 - The company launched a new product - an environmentally clean diesel fuel in accordance with the specification E 590 N ultra sulfur content of 10 ppm (the level of Euro-5).
2011 - Isomerization Unit is commissioned
+
* 2011 - Isomerization Unit is commissioned
2012 - All fuels comply with Euro V
+
* 2012 - Upgrading project completed
Relevant Links
+
===  Links ===
TNK-BP Refining
+
# [http://www.tnk-bp.com/operations/refining/ TNK-BP Refining]
a complex hydrocracker put into operation in Slavneft-Yaroslavnefteorgsintez
+
# [http://www.vnipineft.ru/ru/news/79/ a complex hydrocracker put into operation in Slavneft-Yaroslavnefteorgsintez]
Jacobs Consultancy Receives Contract for Refinery Upgrade Project in Russia
+
# [http://phx.corporate-ir.net/phoenix.zhtml?c=117895&p=irol-newsArticle&ID=1033894&highlight= Jacobs Consultancy Receives Contract for Refinery Upgrade Project in Russia]
TEC was awarded contract for Modernization project of Yaroslavl Petroleum Refinery in the Russian Federation
+
# [http://www.toyo-eng.co.jp/en/company/news/2001/011207/index.html TEC was awarded contract for Modernization project of Yaroslavl Petroleum Refinery in the Russian Federation]
YaNOS launched Izomalk-2
+
# [http://killajoules.wikidot.com/blog:1497 YaNOS launched Izomalk-2]
On July 1, 2012 All Motor Fuel Manufactured at Yanos Will Comply With EURO 5
+
# [http://killajoules.wikidot.com/blog:2646 On July 1, 2012 All Motor Fuel Manufactured at Yanos Will Comply With EURO 5]
refineryrussiaslavneftyanosy
+
 
 +
[[Category:Refinery]]
 +
[[Category:Russia]]
 +
[[Category:Slavneft]]

Revision as of 19:06, 21 March 2020

Summary Information

  • Ownership: Slavneft
  • Website: http://www.slavneft.ru/
  • Location: Yaroslavl
  • Capacity: 14 million tons/annum & 280,000 bbl/day
  • Nelson Complexity:

Refining Units

  • CDU
  • VDU
  • FCC
  • Catalytic Reforming
  • Hydrocracker
  • Diesel Desulphurisation Unit
  • Isomerization Unit - 600,000 tpa - 2011
  • Alkylation Unit
  • Visbreaking Unit
  • Bitumen Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • Since January 2012, all of the fuels produced at the refinery conform to the Euro-4/ Euro-5 environmental standards

Projects

  • In 2012 a major project to increase refining depth and improve product quality was completed
  • The project including the construction of Hydrocracking, Visbreaking, Catalytic Reforming, Isomerization and

Cat-Cracked Gasoline Hydrotreatment Units

Other Information

-

History

  • 1952: The Soviet government decided to build a refinery in Yaroslavl.
  • 1961: Start the first stage of the plant.
  • 1966 Start of construction of a catalytic cracking unit
  • 1995 The company became part of a vertically integrated oil company Slavneft.

September 2004: Visbreaking Unit commissioned

  • 2005: YANOS was first among Russian oil refinery in the production of gasoline Premium Euro-95 "and the diesel fuel with sulfur content of 50 ppm (the level of Euro-4).
  • 2005 - Vacuum gas oil hydrocracking unit commissioned
  • 2006 - Catalytic reforming unit put into operation
  • 2007 - The company launched a new product - an environmentally clean diesel fuel in accordance with the specification E 590 N ultra sulfur content of 10 ppm (the level of Euro-5).
  • 2011 - Isomerization Unit is commissioned
  • 2012 - Upgrading project completed

Links

  1. TNK-BP Refining
  2. a complex hydrocracker put into operation in Slavneft-Yaroslavnefteorgsintez
  3. Jacobs Consultancy Receives Contract for Refinery Upgrade Project in Russia
  4. TEC was awarded contract for Modernization project of Yaroslavl Petroleum Refinery in the Russian Federation
  5. YaNOS launched Izomalk-2
  6. On July 1, 2012 All Motor Fuel Manufactured at Yanos Will Comply With EURO 5