Difference between revisions of "Volgograd Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 45: | Line 45: | ||
# [[Giprogazoochistka Refinery References]] | # [[Giprogazoochistka Refinery References]] | ||
# [[Globalstroy Engineering Refinery References]] | # [[Globalstroy Engineering Refinery References]] | ||
− | # [[ | + | # [[ORGHIM Refinery References]] |
# [http://killajoules.wikidot.com/archive:lukoil-opens-petroleum-products-loading-terminal-in Lukoil Opens Petroleum Products Loading Terminal In Volgograd] | # [http://killajoules.wikidot.com/archive:lukoil-opens-petroleum-products-loading-terminal-in Lukoil Opens Petroleum Products Loading Terminal In Volgograd] | ||
# [http://killajoules.wikidot.com/archive:lukoil-begins-production-of-low-sulfur-fuel-oil-meet Lukoil Begins Production Of Low-Sulfur Fuel Oil Meeting Requirements Of Marpol Convention] | # [http://killajoules.wikidot.com/archive:lukoil-begins-production-of-low-sulfur-fuel-oil-meet Lukoil Begins Production Of Low-Sulfur Fuel Oil Meeting Requirements Of Marpol Convention] |
Latest revision as of 15:25, 7 February 2024
Contents
Summary Information
- Ownership: Lukoil
- Website: http://www.lukoil.com/
- List of Lukoil Refineries
- Location: Volvograd, Southern Russia
- Capacity: 11.25 million tons/annum & 225.000 bbl/day
- Nelson Complexity: 6.9
Refining Units
- Crude distillation 225 bpd
- Vacuum distillation 68.2 bpd
- Coking 18.5 bpd
- Catalytic reforming 43.7 bpd
- Catalytic hydrotreating 95.9 bpd
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Crude oil is supplied to the Refinery via the Samara – Tikhoretsk Pipeline
Products Produced
- Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel, Bitumen
Projects
- In 2016 an upgrading project was completed
- The project replaced old units and increased the capacity of the refinery
- For full details see Volgograd Refinery Project
Other Information
-
History
- 1957 - The Refinery was put into operation
- 1973 - Crude oil processing unit added
- 1979 - Sulfur recovery unit commissioned
- 1991 - the Refinery entered LUKOIL Group
- 1994 - equipment for crude distillation and gasoline reforming was rebuilt.
- 1997–1998 the Refinery launched automatic equipment for blending of gasolines and a rail trestle for crude oil discharge
- In 1998–2001 the Refinery launched equipment for hydrotreatment of diesel fuel, naphta stabilization and fractioning of saturated hydrocarbon gases.
- 2004–2006 the first stage of a coke calcination facility was completed. The Refinery completed construction of a catalytic reforming unit.
- In 2007 an isomerization unit with annual capacity of 380,000 tons was commissioned.
- In 2008 the vacuum block on distillation unit №6 was commissioned after an upgrade. The Refinery switched to production of motor gasolines to Euro-3 standard.
- In 2009 a unit for production of inert gas was brought into operation and a steam recuperation unit was commissioned at the oil loading rack. EKTO diesel fuel production was started.
- 2018 - A new terminal for the loading of bitumen products and lubricants was opened