Difference between revisions of "Timimoun Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Sonatrach * Country: Algeria * Location: * Production start: 2018 * Partners: Sonatrach (51%), Total (37.75%) and Cepsa (11.25%) * Typ...") |
Abarrelfull (talk | contribs) |
||
Line 22: | Line 22: | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2023/06/production-starts-up-at-timimoun-gas.html Production Starts Up at Timimoun Gas Field in Algeria] |
Latest revision as of 08:59, 14 June 2023
Summary Information
- Operator: Sonatrach
- Country: Algeria
- Location:
- Production start: 2018
- Partners: Sonatrach (51%), Total (37.75%) and Cepsa (11.25%)
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Timimoun's gas is produced with 37 wells connected to a gas processing facility that ties into the GR5 pipeline used to transport gas from fields in southwestern Algeria to Hassi R’mel.
Contractors
- -
History
- 2018 - First gas produced