Difference between revisions of "Terang Sirasun Batur Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: * Country: Indonesia * Location: * Production start: * Partners: JAPEX 25%, Mitsubishi 25%, * Type: Oil / Gas * Estimated Reserves: * Pro...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: | * Operator: | ||
* Country: Indonesia | * Country: Indonesia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Terang gas field is located offshore, approximately 90 km north of Bali Island (at the water depth of 90 m) | * Terang gas field is located offshore, approximately 90 km north of Bali Island (at the water depth of 90 m) | ||
− | * The produced gas will be first gathered in the [[Glas Dowr FPSO]] and supplied through the East Java Gas | + | * The produced gas will be first gathered in the [[Glas Dowr FPSO]] and supplied through the [[East Java Gas Pipeline]] |
− | + | === Contractors === | |
− | * | + | * '''J P Kenny:''' Field layout derivation, conceptual design, cost estimates and schedules |
− | * | + | * '''Timas:''' Pipeline installation |
− | + | === History === | |
* 2010 - Sembawang Shipyard awarded FSPO refit contract | * 2010 - Sembawang Shipyard awarded FSPO refit contract | ||
* 2012 - Production starts in Terang gas field | * 2012 - Production starts in Terang gas field | ||
* 2013 - Oil Production in Indonesia’s Terang Gas Field Reaches 10 Million Barrels | * 2013 - Oil Production in Indonesia’s Terang Gas Field Reaches 10 Million Barrels | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[J P Kenny Subsea References]] | # [[J P Kenny Subsea References]] | ||
# [[Serimax Asia Pipeline References]] | # [[Serimax Asia Pipeline References]] |
Latest revision as of 16:51, 16 February 2024
Summary Information
- Operator:
- Country: Indonesia
- Location:
- Production start:
- Partners: JAPEX 25%, Mitsubishi 25%,
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Terang gas field is located offshore, approximately 90 km north of Bali Island (at the water depth of 90 m)
- The produced gas will be first gathered in the Glas Dowr FPSO and supplied through the East Java Gas Pipeline
Contractors
- J P Kenny: Field layout derivation, conceptual design, cost estimates and schedules
- Timas: Pipeline installation
History
- 2010 - Sembawang Shipyard awarded FSPO refit contract
- 2012 - Production starts in Terang gas field
- 2013 - Oil Production in Indonesia’s Terang Gas Field Reaches 10 Million Barrels
Geology
Links
- J P Kenny Subsea References
- Serimax Asia Pipeline References
- Sembcorp Marine’s Sembawang Shipyard Secures FPSO Conversion And Upgrading Contracts Worth S$75 Million
- Production starts in Terang gas field of Kangean PSC area at Republic of Indonesia
- Oil Production in Indonesia’s Terang Gas Field Reaches 10 Million Barrels