Tennessee Gas Pipeline
Revision as of 16:20, 29 November 2023 by Abarrelfull (talk | contribs)
Summary Information
- Sources: Louisiana, the Gulf of Mexico and south Texas
- Destination: northeastern United States
- Ownership: Kinder Morgan
- Website: http://www.kindermorgan.com/
- Length: kilometres (13,900 miles)
- Capacity: 7.5 billion cubic feet (Bcf) per day
- Status: Operating
Details
- TGP is a 13,900-mile pipeline system with a design capacity of about 7.5 billion cubic feet (Bcf) per day. It transports natural gas from Louisiana, the Gulf of Mexico and south Texas to the northeastern United States, including the metropolitan areas of New York City and Boston
- It is supplied by the Constitution Gas Pipeline Company, Independence Trail Natural Gas Pipeline, High Island Offshore Natural Gas Pipeline System, Viosca Knoll Gas Pipeline System and Destin Gas Pipeline
- Tennessee Gas Pipeline connects with the Columbia Gas Transmission Corporation at the Milford Compressor station in Pennsylvania and with Gulf South Gas Pipeline System
- It connects to the Iroquois Gas Pipeline at Wright , NY and to the East Tennessee Natural Gas Pipeline
- The pipeline is connected to the Egan Natural Gas Hub, the Perryville Center Natural Gas Hub and the Everett Marine LNG Terminal
- It can supply the Cameron LNG Export Terminal Project
- There is to be an interconnect to supply the Driftwood LNG Export Terminal Project
Contractors
- **UniversalPegasus:** Project management, field survey, right-‐of-‐way, and mapping services for the West-‐East Pipeline Project
History
- 1998 - South Pass 77 System Expansion & Tenneco /DOMAC Co Expansion completed
- 1999 - LSP Electric Lateral & Reynosa/Pemex Export connection completed
- 2001 - Texas Deepwater Link, Concord Lateral Expansion & Eastern Express 2000 Zone 6 completed
- 2002 - Stagecoach Lateral & Rhode Island Lateral completed
- 2003 - Can-East/Leidy Extension & South Texas Export completed
- 2005 - Tewksbury-Andover Lateral completed
- 2007 - Triple-T Extension & Deepwater Link Project completed
- 2009 - Expansion of Concord Lateral & Carthage Lateral completed
- 2011 - 300 Line Expansion Project
- 2012 - Station 230C Project & Northeast Supply Diversification Project
- 2012 - Kinder Morgan Energy Partners, acquired a 100 % stake
- 2013 - Northeast Upgrade Project & MPP Project
- 2014 - Rose Lake Expansion Project
Other Information
- -