Difference between revisions of "Talara Refinery Upgrade Project"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: Petroperu * Website: http://www.petroperu.com.pe/ * Wikipage: [[[Talara Refinery]]] * Location: Talara, seashore province of Piura Departm...")
 
Line 3: Line 3:
 
* Ownership:  Petroperu
 
* Ownership:  Petroperu
 
* Website:  http://www.petroperu.com.pe/
 
* Website:  http://www.petroperu.com.pe/
* Wikipage: [[[Talara Refinery]]]
+
* Wikipage: [[Talara Refinery]]
 
* Location:  Talara, seashore province of Piura Department, Peru
 
* Location:  Talara, seashore province of Piura Department, Peru
 
* Capacity:  3.1 million tons/annum & 62.000 bbl/day  
 
* Capacity:  3.1 million tons/annum & 62.000 bbl/day  
 
* Nelson Complexity:  
 
* Nelson Complexity:  
 
* Project Stage: Contract Awards (June 2014)
 
* Project Stage: Contract Awards (June 2014)
* Expected Completion: [[[Refinery Projects to be Completed in 2019 | 2019]]]
+
* Expected Completion: [[Refinery Projects to be Completed in 2019 | 2019]]
 
* Budget: $1.7 Billion
 
* Budget: $1.7 Billion
  
Line 16: Line 16:
 
* Project Summary: The Project consists on the revamping of the existing units, the desulfurization of Diesel and gasoline, bottom conversion and the incensement of the average octane of gasoline; in addition, the production of sulfuric acid and self consumption generated electricity.
 
* Project Summary: The Project consists on the revamping of the existing units, the desulfurization of Diesel and gasoline, bottom conversion and the incensement of the average octane of gasoline; in addition, the production of sulfuric acid and self consumption generated electricity.
 
* The capacities estimated for the selected process configuration are the following:  
 
* The capacities estimated for the selected process configuration are the following:  
* Revamping and modification of existing processes units:
+
** Revamping and modification of existing processes units:
* Primary Distillation Unit (from 62,0 to 95,0 kBSD)  
+
** Primary Distillation Unit (from 62,0 to 95,0 kBSD)  
* Catalytic Cracking Unit (from 19,0 to 25,0 (kBSD), including the Gas Recovering Unit and Gas and Gasoline Hydrotreating.  
+
** Catalytic Cracking Unit (from 19,0 to 25,0 (kBSD), including the Gas Recovering Unit and Gas and Gasoline Hydrotreating.  
* Fitting of the Vacuum Distillate Unit - VDU I (21,0 kBSD) to heavier charges.  
+
** Fitting of the Vacuum Distillate Unit - VDU I (21,0 kBSD) to heavier charges.  
 
* Construction of new processes units:
 
* Construction of new processes units:
* Hydrotreating of Diesel (41,0 kBSD)  
+
** Hydrotreating of Diesel (41,0 kBSD)  
* Hydrotreating of cracking naphtha (9,5 kBSD)  
+
** Hydrotreating of cracking naphtha (9,5 kBSD)  
* Vacuum Distillate VDU III (35, 0 kBSD)  
+
** Vacuum Distillate VDU III (35, 0 kBSD)  
* Coker (22,6 kBSD)  
+
** Coker (22,6 kBSD)  
* Hydrotreating of naphtha (13,3 kBSD)  
+
** Hydrotreating of naphtha (13,3 kBSD)  
* Catalytic reformation of naphtha (9,5 kBSD)  
+
** Catalytic reformation of naphtha (9,5 kBSD)  
* Hydrogen Plant (21,0 MMPCD)  
+
** Hydrogen Plant (21,0 MMPCD)  
* Sulfuric Acid Recovering Plant (362,0 TMD)  
+
** Sulfuric Acid Recovering Plant (362,0 TMD)  
* Amines Plant  
+
** Amines Plant  
* Cogeneration Plant  
+
** Cogeneration Plant  
 
* Revamping and modification of Industrial Services and General Facilities:
 
* Revamping and modification of Industrial Services and General Facilities:
* Industrial Services (Utilities):
+
** Industrial Services (Utilities):
* Electric energy Supply  
+
** Electric energy Supply  
* Steam supply  
+
** Steam supply  
* Water supply for industrial use  
+
** Water supply for industrial use  
* Sea Water supply  
+
** Sea Water supply  
* Gas supply  
+
** Gas supply  
* Compressed air supply  
+
** Compressed air supply  
* General Facilities (Facilities):
+
** General Facilities (Facilities):
* Crude and products storage system  
+
** Crude and products storage system  
* Drain system and slop recovering  
+
** Drain system and slop recovering  
* Pressure and Flare relieve system  
+
** Pressure and Flare relieve system  
* Port facilities  
+
** Port facilities  
* Control and security system  
+
** Control and security system  
* Fire system  
+
** Fire system  
* Laboratory  
+
** Laboratory  
* Workshops  
+
** Workshops  
  
 
* Main Contractors:  
 
* Main Contractors:  
* Tecnicas Reunidas: Design and detailed engineering, procurement of all equipment and materials, construction and assistance to the start-up of the facility
+
** Tecnicas Reunidas: Design and detailed engineering, procurement of all equipment and materials, construction and assistance to the start-up of the facility
* **Haldor Topsoe** will supply license, engineering, catalyst and proprietary equipment  
+
** **Haldor Topsoe** will supply license, engineering, catalyst and proprietary equipment  
  
 
+++ Refining Units
 
+++ Refining Units
Line 95: Line 95:
  
 
# [http://www.petroperu.com.pe/pmrt/Main.asp?WebMode=PMRT_ENG Project Website]
 
# [http://www.petroperu.com.pe/pmrt/Main.asp?WebMode=PMRT_ENG Project Website]
# [[[Otepi Refinery References]]]
+
# [[Otepi Refinery References]]
 
# [http://killajoules.wikidot.com/archive:topsoe-signs-refining-contract-with-petroperu Topsoe signs refining contract with PetroPeru]
 
# [http://killajoules.wikidot.com/archive:topsoe-signs-refining-contract-with-petroperu Topsoe signs refining contract with PetroPeru]
 
# [http://www.international.alberta.ca/images/about/Peru_-_Talara_Refinery_Modernization_Project.pdf Talara Refinery Modernisation Project Presentation]
 
# [http://www.international.alberta.ca/images/about/Peru_-_Talara_Refinery_Modernization_Project.pdf Talara Refinery Modernisation Project Presentation]
 
# [http://killajoules.wikidot.com/blog:2567 Societe Generale Signs deal To Fund Modernization of Petroperú 's Talara Refinery]
 
# [http://killajoules.wikidot.com/blog:2567 Societe Generale Signs deal To Fund Modernization of Petroperú 's Talara Refinery]
 
# [http://killajoules.wikidot.com/blog:5213 Petroperu awards to TR the Talara refinery modernization project (Peru)]
 
# [http://killajoules.wikidot.com/blog:5213 Petroperu awards to TR the Talara refinery modernization project (Peru)]

Revision as of 22:01, 17 January 2023

Summary Information

  • Ownership: Petroperu
  • Website: http://www.petroperu.com.pe/
  • Wikipage: Talara Refinery
  • Location: Talara, seashore province of Piura Department, Peru
  • Capacity: 3.1 million tons/annum & 62.000 bbl/day
  • Nelson Complexity:
  • Project Stage: Contract Awards (June 2014)
  • Expected Completion: 2019
  • Budget: $1.7 Billion

+++ The Project

  • Project Type: Upgrade
  • Project Summary: The Project consists on the revamping of the existing units, the desulfurization of Diesel and gasoline, bottom conversion and the incensement of the average octane of gasoline; in addition, the production of sulfuric acid and self consumption generated electricity.
  • The capacities estimated for the selected process configuration are the following:
    • Revamping and modification of existing processes units:
    • Primary Distillation Unit (from 62,0 to 95,0 kBSD)
    • Catalytic Cracking Unit (from 19,0 to 25,0 (kBSD), including the Gas Recovering Unit and Gas and Gasoline Hydrotreating.
    • Fitting of the Vacuum Distillate Unit - VDU I (21,0 kBSD) to heavier charges.
  • Construction of new processes units:
    • Hydrotreating of Diesel (41,0 kBSD)
    • Hydrotreating of cracking naphtha (9,5 kBSD)
    • Vacuum Distillate VDU III (35, 0 kBSD)
    • Coker (22,6 kBSD)
    • Hydrotreating of naphtha (13,3 kBSD)
    • Catalytic reformation of naphtha (9,5 kBSD)
    • Hydrogen Plant (21,0 MMPCD)
    • Sulfuric Acid Recovering Plant (362,0 TMD)
    • Amines Plant
    • Cogeneration Plant
  • Revamping and modification of Industrial Services and General Facilities:
    • Industrial Services (Utilities):
    • Electric energy Supply
    • Steam supply
    • Water supply for industrial use
    • Sea Water supply
    • Gas supply
    • Compressed air supply
    • General Facilities (Facilities):
    • Crude and products storage system
    • Drain system and slop recovering
    • Pressure and Flare relieve system
    • Port facilities
    • Control and security system
    • Fire system
    • Laboratory
    • Workshops
  • Main Contractors:
    • Tecnicas Reunidas: Design and detailed engineering, procurement of all equipment and materials, construction and assistance to the start-up of the facility
    • **Haldor Topsoe** will supply license, engineering, catalyst and proprietary equipment

+++ Refining Units

  • Hydrotreating of Diesel (41,0 kBSD)
  • Hydrotreating of cracking naphtha (9,5 kBSD)
  • Vacuum Distillate VDU III (35, 0 kBSD)
  • Coker (22,6 kBSD)
  • Hydrotreating of naphtha (13,3 kBSD)
  • Catalytic reformation of naphtha (9,5 kBSD)
  • Hydrogen Plant (21,0 MMPCD)
  • Sulfuric Acid Recovering Plant (362,0 TMD)
  • Amines Plant
  • Cogeneration Plant


+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • The project will enable the refinery to use very heavy crude oils, down to 18 API, compared to 30 API today.


+++ Products Produced

  • The project will enable the refinery to produce Ultra Low Sulphur Diesel, Low Sulphur Gasoline and Sulphuric Acid. It will also improve the product mix and increase capacity.

+++ History

  • 2012 - Societe Generale Signs deal To Fund Modernization of Petroperú 's Talara Refinery
  • 2014 - Tecnicas Reunidas awarded EPC contract

+++ Other Information

  • -


+++ Relevant Links

  1. Project Website
  2. Otepi Refinery References
  3. Topsoe signs refining contract with PetroPeru
  4. Talara Refinery Modernisation Project Presentation
  5. Societe Generale Signs deal To Fund Modernization of Petroperú 's Talara Refinery
  6. Petroperu awards to TR the Talara refinery modernization project (Peru)