Difference between revisions of "Shetland Island Regional Gas Export Pipeline System (SIRGE)"

From A Barrel Full
Jump to navigation Jump to search
 
Line 14: Line 14:
  
 
=== History ===
 
=== History ===
 +
* 2015 - NSMP acquired the pipeline from Total
 
* 2016 - Pipeline enter operations
 
* 2016 - Pipeline enter operations
  
Line 21: Line 22:
 
=== Links ===
 
=== Links ===
 
# [https://www.nsmp-limited.com/our-assets/sirge-pipeline/ SIRGE Pipeline, NSMP]
 
# [https://www.nsmp-limited.com/our-assets/sirge-pipeline/ SIRGE Pipeline, NSMP]
 +
# [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:UK]]
 
[[category:UK]]
 
[[category:NSMP]]
 
[[category:NSMP]]

Latest revision as of 10:09, 8 May 2024

Summary Information

  • Source: Sullom Voe
  • Destination: Frigg UK Gas Pipeline System
  • Ownership: NSMP
  • Website: https://www.nsmp-limited.com/
  • Length: 234 kilometres ( miles)
  • Capacity: 665mmscf per day
  • Status: Operating

Details

History

  • 2015 - NSMP acquired the pipeline from Total
  • 2016 - Pipeline enter operations

Other Information

  • -

Links

  1. SIRGE Pipeline, NSMP
  2. NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited