Difference between revisions of "Shah Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: ADNOC / Oxy |
* Website: | * Website: | ||
− | * Location: | + | * Location: Abu Dhabi |
− | * Capacity: | + | * Capacity: 1.45 billion standard cubic feet per day |
=== Brief Description === | === Brief Description === | ||
− | * | + | * The largest sour gas plant in the world, the Shah Gas plant can now process 1.45 billion standard cubic feet per day. It was originally designed to process 1.0 billion standard cubic feet per day. |
=== Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
* [[Shah Gas Field]] | * [[Shah Gas Field]] | ||
− | === | + | === Projects === |
− | * | + | * An expansion project was completed in 2023, that increased capacity from 1.28 to 1.45 billion standard cubic feet per day |
=== Other Information === | === Other Information === | ||
Line 19: | Line 19: | ||
=== History === | === History === | ||
− | * - | + | * 2014 - Plant began operations |
+ | * 2021 - Saipem awarded expansion project | ||
=== Links === | === Links === | ||
− | # [ ] | + | # [https://abarrelfull.blogspot.com/2024/03/saipem-new-contract-awarded-by-abu.html Saipem: new contract awarded by the Abu Dhabi National Oil Company (ADNOC) for the Shah Gas plant in the United Arab Emirates] |
[[category:Processing]] | [[category:Processing]] | ||
[[category:UAE]] | [[category:UAE]] | ||
[[category:ADNOC]] | [[category:ADNOC]] |
Latest revision as of 17:37, 3 March 2024
Contents
Summary Information
- Ownership: ADNOC / Oxy
- Website:
- Location: Abu Dhabi
- Capacity: 1.45 billion standard cubic feet per day
Brief Description
- The largest sour gas plant in the world, the Shah Gas plant can now process 1.45 billion standard cubic feet per day. It was originally designed to process 1.0 billion standard cubic feet per day.
Related Oil and Gas Fields
Projects
- An expansion project was completed in 2023, that increased capacity from 1.28 to 1.45 billion standard cubic feet per day
Other Information
- -
History
- 2014 - Plant began operations
- 2021 - Saipem awarded expansion project