Difference between revisions of "Scott and Telford Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 38: Line 38:
  
 
=== Links ===
 
=== Links ===
# [[[List Of Oil Production Platforms In The UK]]]
+
# [[List Of Oil Production Platforms In The UK]]
# [[[List Of Oil and Gas Production Platforms In The UK]]]
+
# [[List Of Oil and Gas Production Platforms In The UK]]
# [[[KWsubsea Upheaval Buckling And Out Of Straightness Analysis]]]
+
# [[KWsubsea Upheaval Buckling And Out Of Straightness Analysis]]
 
# [http://killajoules.wikidot.com/archive:amerada-hess-completes-sale-of-gulf-of-mexico-shelf Amerada Hess Completes Sale Of Gulf Of Mexico Shelf Properties - Announces Agreement To Exchange Oil And Gas Properties]
 
# [http://killajoules.wikidot.com/archive:amerada-hess-completes-sale-of-gulf-of-mexico-shelf Amerada Hess Completes Sale Of Gulf Of Mexico Shelf Properties - Announces Agreement To Exchange Oil And Gas Properties]
 
# [http://killajoules.wikidot.com/archive:encana-sharpens-focus-on-north-american-natural-gas EnCana sharpens focus on North American natural gas and oilsands, agrees to sell all U.K. North Sea assets]
 
# [http://killajoules.wikidot.com/archive:encana-sharpens-focus-on-north-american-natural-gas EnCana sharpens focus on North American natural gas and oilsands, agrees to sell all U.K. North Sea assets]

Revision as of 15:43, 31 March 2022

Summary Information

  • Operator: Nexen
  • Country: UK
  • Location: Outer Moray Firth Area
  • Production start: 1993
  • Partners: Dana
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Scott/Telford Area is located in the Outer Moray Firth Area
  • The Scott platform consists of two steel jackets, linked by two bridges, supporting a Drilling/Production (DP) deck and a Utilities/Quarters (UQ) deck.
  • Oil is exported via the [[[Forties Pipeline System]]]
  • Gas is transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]]
  • The Telford field lies 10km to the south of Scott, across blocks 15/21a and 15/22b, and has been developed as a subsea tie-back to the Scott Production Platform
  • The Greater Rochelle Oil And Gas Fields are tied back to the Scott platform

+++ Contractors

  • **McDermott:** Construction of the Scott Platforms
  • **KWsubsea:** 10" Pipeline approximately 4km long for Telford

History

  • 1987 - Scott field discovered
  • 1990 - Scott field development approved
  • 1992 - Scott JD platform installed
  • 1993 - Scott JP platform installed
  • 1995 - Telford field development approved
  • 2003 - EnCana acquires a share from Hess
  • 2004 - Nexen acquired stake from EnCana
  • 2010 - Dana Acquires a stake from Petro-Canada
  • 2011 - Apache Completes Acquisition of ExxonMobil's Stake
  • 2014 - MOL acquires stakes in the fields from Premier Oil
  • 2022 - MOL agrees to sell its stake to Waldorf

+++ Geology

Links

  1. List Of Oil Production Platforms In The UK
  2. List Of Oil and Gas Production Platforms In The UK
  3. KWsubsea Upheaval Buckling And Out Of Straightness Analysis
  4. Amerada Hess Completes Sale Of Gulf Of Mexico Shelf Properties - Announces Agreement To Exchange Oil And Gas Properties
  5. EnCana sharpens focus on North American natural gas and oilsands, agrees to sell all U.K. North Sea assets
  6. Dana Acquires UKCS Interests From Petro-Canada UK Limited
  7. Apache Completes Acquisition of ExxonMobil's Beryl Field, Other UK North Sea Assets
  8. MOL extends its upstream portfolio in the Central North Sea
  9. MOL divests Upstream assets in the UK