Schwedt Refinery

From A Barrel Full
Revision as of 06:29, 11 February 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: PCK Raffinerie GmbH Website: http://www.pck.de/ Location: Schwedt/Oder Capacity: 12 million tons/annum & 240,000 bbl/day Nelson Complexity: 9.2...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: PCK Raffinerie GmbH Website: http://www.pck.de/ Location: Schwedt/Oder Capacity: 12 million tons/annum & 240,000 bbl/day Nelson Complexity: 9.2 Refining Units crude-oil distillation units 10.800kt/a vacuum distillation units 5.500 kt/a catalytic conversion plant (FCC) 2.850 kt/a thermal conversion plant (visbreaker, HSC) 2.600 kt/a catalytic reformer plants 1.530 kt/a alkylation 330 kt/a isomerisation 575 kt/a ETBE 96 kt/a desulphurisation plants for petrol fuels 2.200 kt/a for petroleum and middle distillates 5.300 kt/a for vacuum distillates 3.300 kt/a production of bitumen 420 kt/a production of sulphur 160 kt/a aromatics production 230 kt/a production of terephtalic acid 83 kt/a power plant steam generation 1.550 t/h generation of electricity 300 MW Brief Description The refinery is a large complex refinery Terminal Capacity Crude Oil: Refined Products: Crude Supply PCK mainly processes crude oil from Russia supplied through the Druzhba Pipeline It can also recieve crude via the Rostock-Schwedt Crude Oil Pipeline Products Produced Gasoline, Diesel fuel, light heating oil, Liquid gas, Bitumen, Jet fuel, Sulphur Ongoing Projects - Other Information The refinery is jointly owned by Shell, BP, Rosneft, Agip Also known as AET Refinery History 30th Dezember 1958 Registration of a company as a petroleum processing plant in Schwedt (EVW) 11th November 1960 November Foundation stone laid 18th Dezember 1963 Commissioning of the crude oil pipeline 1st April 1964 - First stage in the processing of crude oil (2 million t / a) 1966 - 1969 Expansion of crude oil processing including two more crude oil distillation, refining facilities for gas, gasoline and diesel fuel systems for gasoline production and sulfur recovery 1967 - The oil pipeline Schwedt - Leuna (340 km) and the fuel line Schwedt - Seefeld (78 km) is put into operation. 1968 - Beginning of the supply West Berlin with PCK-fuels 30th December 1970 - Establishing petrochemical Kombinat Schwedt 1972 - Terephthalic acid plant commissioning 1981/1982 - Start-gap and Aromatenkomplex May 1984 - Commissioning visbreaker plant December 1988 - Commissioning of the world's first and only HSC (High Soaker Cracking conversion) plant April / May 1990 - Transformation of the operations of state-owned conglomerate in PCK corporations (resolution of the conglomerate) 30th May 1990 - Acquisition of PCK by the Trust July 1991 - Privatization of the PCK refinery by the shareholders Veba Oel AG, DEA AG and AET Petroleum Refinery social participation mbH 1991 - 1995 - Transformation and modernization by the shareholders to one of the most modern and efficient refineries in Europe 1994 - PCK refinery participates for the first time in international comparison "Solomon Benchmarking" 1996 - Renaming of the petrochemical and fuels AG PCK refinery GmbH 1996 - PCK refinery in an international comparison "Solomon", the refinery with the lowest processing costs in Western Europe Juni 1998 - Commissioning the new industrial power station 1998 - 2002 - Implementation of the Auto / Oil program for the production of sulfur fuels 1998 - Modernization of Rostock pipeline and the tank farm Rostock, increasing the pipeline capacity to 6.8 million tons of crude oil per year and installation of an environmental monitoring system 2002 - Commissioning of the hydrogen-generating facility (H2B) 2004 -Establishing the IP Industrial Park Schwedt GmbH & Co. KG as an independent company 2004 - Transformation to ETBE plant for the chemical integration of bio-ethanol 2006 - Commissioning of the light gasoline unit for chemical incorporation of bioethanol in gasoline 2007 - Commissioning propylene splitter 2010 - Rosneft acquired PDVSA's stake 2014 - Desulphurization plant revamp completed 2014 - Rosneft acquired Total's stake Relevant Links Refinery Webpage Uhde to build turnkey plant for PCK refinery in Schwedt, Germany Poerner Refinery References Uhde Downstream Oil And Gas Projects Rosneft to Acquire 50% of Ruhr Oel GmbH Rosneft Acquires 16.67% Share in PCK Raffinerie GmbH Total and Rosneft Signed a Sale and Purchase Agreement with Regard to the 16.67% Share in PCK Raffinerie GmbH Rosneft and BP Sign Production, Exploration and Refining Agreements