Difference between revisions of "Scarborough Gas Field"

From A Barrel Full
Jump to navigation Jump to search
Line 25: Line 25:
 
* 2021 - FID for the project
 
* 2021 - FID for the project
 
* 2022 - EPCIC awarded for the platform
 
* 2022 - EPCIC awarded for the platform
 +
* 2023 - Woodside sold 10% to LNG Japan
  
 
=== Geology ===
 
=== Geology ===
Line 33: Line 34:
 
# [https://a-barrel-full.blogspot.com/2021/12/subsea-7-awarded-contract-offshore_20.html Subsea 7 awarded contract offshore Australia]
 
# [https://a-barrel-full.blogspot.com/2021/12/subsea-7-awarded-contract-offshore_20.html Subsea 7 awarded contract offshore Australia]
 
# [https://a-barrel-full.blogspot.com/2022/01/mcdermott-wins-scarborough-epcic.html McDermott Wins Scarborough EPCIC Contract]
 
# [https://a-barrel-full.blogspot.com/2022/01/mcdermott-wins-scarborough-epcic.html McDermott Wins Scarborough EPCIC Contract]
 +
# [https://lng-news.blogspot.com/2023/08/woodside-to-sell-10-scarborough.html Woodside To Sell 10% Scarborough Interest to LNG Japan]
  
 
[[category:LNG]]
 
[[category:LNG]]
 +
[[category:Field]]
 
[[category:Australia]]
 
[[category:Australia]]
 
[[category:Woodside]]
 
[[category:Woodside]]

Revision as of 06:00, 8 August 2023

Summary Information

  • Operator: Woodside
  • Country: Australia
  • Location: Carnarvon Basin
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves: 13 TCF
  • Production Volume:

Description

  • The Scarborough gas resource is located in the Carnarvon Basin, approximately 375 km west-north-west of the Burrup Peninsula in Western Australia.
  • The Scarborough gas resource is part of the Greater Scarborough gas fields which are estimated to hold 13.0 Tcf (2C, 100%) of dry gas.
  • The Greater Scarborough gas fields include Thebe (1.4 Tcf, 2C, 100%), Jupiter (0.5 Tcf, 2C, 100%) and Scarborough (11.1 Tcf, 2C, 100%).
  • The proposal is to initially develop the field with eight subsea, high-rate gas wells, and thirteen wells drilled over the life of the Scarborough field, with all wells tied back to a semi-submersible floating production unit (FPU) moored in 950 m of water close to the Scarborough field.
  • Approximately five million tonnes per annum (Mtpa) of Scarborough gas will be processed through Pluto Train 2, with up to 3 Mtpa processed through the existing Pluto Train 1.

Contractors

  • McDermott 7 -
    • Front-End Engineering Design (FEED)for the Floating Production Unit (FPU)
    • Engineering, procurement, construction, installation and commissioning (EPCIC) services for the Floating Production Unit (FPU)
  • Subsea 7 - Engineering, procurement, construction, and installation (EPCI) of subsea pipelines and production systems. The development will include 45 kilometres of rigid flowlines, six flexible flowline risers, 42 kilometres of umbilicals and eight trees, as well as associated subsea equipment

History

  • 2021 - FID for the project
  • 2022 - EPCIC awarded for the platform
  • 2023 - Woodside sold 10% to LNG Japan

Geology

Links

  1. Scarborough And Pluto Train 2 Developments Approved
  2. Subsea 7 awarded contract offshore Australia
  3. McDermott Wins Scarborough EPCIC Contract
  4. Woodside To Sell 10% Scarborough Interest to LNG Japan