Difference between revisions of "Sartorp Jubail Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === === Brief Description === === Refining Units === === Terminal Capacity === === Crude Supply === === Products Produced === === Projects === *...") |
Abarrelfull (talk | contribs) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
+ | * Ownership: Saudi Aramco / Total | ||
+ | * Website: http://www.satorp.com/ | ||
+ | ** [[Saudi Aramco Refineries]] | ||
+ | ** [[Total Refineries]] | ||
+ | * Location: Jubail | ||
+ | * Capacity: 20.0 million tons/annum & 400,000 bbl/day | ||
+ | * Nelson complexity: 11.9 | ||
=== Brief Description === | === Brief Description === | ||
− | + | * A large dual train highly complex refinery that processes heavy sour crude oil | |
=== Refining Units === | === Refining Units === | ||
− | + | * Atmospheric Distillation | |
+ | * Vacuum Distillation | ||
+ | * Diesel Desulphurisation | ||
+ | * Hydrocracker | ||
+ | * Fluidised Catalytic Cracker | ||
+ | * Coker | ||
+ | * Sulphur Recovery | ||
=== Terminal Capacity === | === Terminal Capacity === | ||
=== Crude Supply === | === Crude Supply === | ||
− | + | * The refinery processes Arabian Heavy | |
=== Products Produced === | === Products Produced === | ||
+ | * The full-conversion refinery maximizes production of diesel and jet fuels | ||
+ | * It also produces 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene. | ||
+ | * The refinery supplies Naphtha to the [[Sadara Petrochemical Complex]] | ||
=== Projects === | === Projects === | ||
− | * The refinery was commissioned in | + | * The refinery is being debottlenecked, a project that should be completed in 2020 |
+ | * The refinery was commissioned in 2014 | ||
* See [[Jubail Refinery Project]] for details | * See [[Jubail Refinery Project]] for details | ||
=== Other Information === | === Other Information === | ||
- | - | ||
=== History === | === History === | ||
+ | * 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery | ||
+ | * 2014 - The refinery was commissioned | ||
+ | * 2019 - The debottlenecking project was launched | ||
=== Links === | === Links === | ||
+ | # [https://www.total.com/en/energy-expertise/projects/refining-petrochemical-platform/satorp Sartorp, from Total] | ||
+ | # [[Chiyoda Sweetening Units]] | ||
+ | # [[Chiyoda Thermal Cracking Units]] | ||
+ | # [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-sign-memorandum-of-understand Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery] | ||
+ | # [http://killajoules.wikidot.com/archive:satorp-totals-biggest-complex-is-officially-inaugura SATORP, Total’s Biggest Complex, Is Officially Inaugurated] | ||
+ | # [http://killajoules.wikidot.com/archive:kbr-awarded-contract-for-refinery-debottlenecking-pr/ KBR Awarded Contract For Refinery Debottlenecking Project In Saudi Arabia] | ||
+ | |||
+ | [[Category:Refinery]] | ||
+ | [[Category:Saudi Arabia]] | ||
+ | [[Category:Saudi Aramco]] | ||
+ | [[Category:Total]] |
Latest revision as of 10:15, 7 February 2024
Contents
Summary Information
- Ownership: Saudi Aramco / Total
- Website: http://www.satorp.com/
- Location: Jubail
- Capacity: 20.0 million tons/annum & 400,000 bbl/day
- Nelson complexity: 11.9
Brief Description
- A large dual train highly complex refinery that processes heavy sour crude oil
Refining Units
- Atmospheric Distillation
- Vacuum Distillation
- Diesel Desulphurisation
- Hydrocracker
- Fluidised Catalytic Cracker
- Coker
- Sulphur Recovery
Terminal Capacity
Crude Supply
- The refinery processes Arabian Heavy
Products Produced
- The full-conversion refinery maximizes production of diesel and jet fuels
- It also produces 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene.
- The refinery supplies Naphtha to the Sadara Petrochemical Complex
Projects
- The refinery is being debottlenecked, a project that should be completed in 2020
- The refinery was commissioned in 2014
- See Jubail Refinery Project for details
Other Information
-
History
- 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery
- 2014 - The refinery was commissioned
- 2019 - The debottlenecking project was launched
Links
- Sartorp, from Total
- Chiyoda Sweetening Units
- Chiyoda Thermal Cracking Units
- Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery
- SATORP, Total’s Biggest Complex, Is Officially Inaugurated
- KBR Awarded Contract For Refinery Debottlenecking Project In Saudi Arabia