Difference between revisions of "Sartorp Jubail Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 36: | Line 36: | ||
=== Links === | === Links === | ||
# [https://www.total.com/en/energy-expertise/projects/refining-petrochemical-platform/satorp Sartorp, from Total] | # [https://www.total.com/en/energy-expertise/projects/refining-petrochemical-platform/satorp Sartorp, from Total] | ||
+ | # [[Chiyoda Sweetening Units]] | ||
# [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-sign-memorandum-of-understand Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery] | # [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-sign-memorandum-of-understand Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery] | ||
# [http://killajoules.wikidot.com/archive:satorp-totals-biggest-complex-is-officially-inaugura SATORP, Total’s Biggest Complex, Is Officially Inaugurated] | # [http://killajoules.wikidot.com/archive:satorp-totals-biggest-complex-is-officially-inaugura SATORP, Total’s Biggest Complex, Is Officially Inaugurated] |
Revision as of 17:48, 19 January 2023
Contents
Summary Information
- Ownership: Saudi Aramco / Total
- Website: http://www.satorp.com/
- Location: Jubail
- Capacity: 20.0 million tons/annum & 400,000 bbl/day
- Nelson complexity: 11.9
Brief Description
- A large dual train highly complex refinery that processes heavy sour crude oil
Refining Units
- Atmospheric Distillation
- Vacuum Distillation
- Diesel Desulphurisation
- Hydrocracker
- Fluidised Catalytic Cracker
- Coker
- Sulphur Recovery
Terminal Capacity
Crude Supply
- The refinery processes Arabian Heavy
Products Produced
- The full-conversion refinery maximizes production of diesel and jet fuels
- It also produces 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene.
Projects
- The refinery is being debottlenecked, a project that should be completed in 2020
- The refinery was commissioned in 2014
- See Jubail Refinery Project for details
Other Information
-
History
- 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery
- 2014 - The refinery was commissioned
- 2019 - The debottlenecking project was launched