Difference between revisions of "Sanga-Sanga PSC Gas and Condensate Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: VICO (BP) * Country: Indonesia * Location: 2.42 Sanga-Sanga PSC * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * P...") |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
* The oil and gas produced are processed in four main production plants. | * The oil and gas produced are processed in four main production plants. | ||
* The first development was in Badak, in 1977, followed by Nilam (1982), Mutiara (1990) and Semberah (1991) | * The first development was in Badak, in 1977, followed by Nilam (1982), Mutiara (1990) and Semberah (1991) | ||
− | * The fields supply gas to the | + | * The fields supply gas to the [[Bontang LNG Terminal]] |
+++ Contractors | +++ Contractors |
Latest revision as of 13:23, 26 February 2024
Summary Information
- Operator: VICO (BP)
- Country: Indonesia
- Location: 2.42 Sanga-Sanga PSC
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Production Sharing Contract area of Sanga-Sanga PSC includes seven oil and gas producing fields
- They are Badak, Nilam, Pamaguan, Semberah, Mutiara, Beras, and Lempake.
- The oil and gas produced are processed in four main production plants.
- The first development was in Badak, in 1977, followed by Nilam (1982), Mutiara (1990) and Semberah (1991)
- The fields supply gas to the Bontang LNG Terminal
+++ Contractors
- **Tripatra:** Engineering for a 600 MMSCFD gas processing plant
+++ History
- 1972 - Badak field discovered
- 1977 - Badak starts production
- 1982 - First production from Nilam
- 1990 - First gas from Mutiara
- 1991 - Semberah field commissioned
- 2001 - ENI becomes a partner
+++ Geology
+++ Links