Sakaide Refinery

From A Barrel Full
Revision as of 15:48, 29 March 2020 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Ownership: Cosmo Oil
  • Website: http://www.cosmo-oil.co.jp/
  • Location: Sakaide, Kagawa, Japan
  • Capacity: 5.5 million tons/annum & 110,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A medium sized medium complexity refinery, it has now been closed and converted into a terminal

Refining Units

  • Atmospheric Distillation - 140,000 barrels / day
  • Vacuum Distillation Unit 41,500 barrels / day
  • Fluid Catalytic Cracking Unit 20,000 barrels / day
  • Naphtha Hydrodesulfurization Unit 16,000 barrels / day
  • Catalytic Reforming Unit 14,000 barrels / day
  • Reformate Splitter 13,000 barrels / day
  • Kerosene&Gas Oil Hydrodesulfurization Unit 27,000 barrels / day
  • Gas Oil Hydrodesulfurization Unit 40,000 barrels / day
  • Vacuum Gas Oil Hydrodesulfurization Unit 17,200 barrels / day
  • Fuel Oil Hydrodesulfurization Unit 30,000 barrels / day
  • No.1 Hydrogen Producing Unit 324,000 m3N / day
  • No.2 Hydrogen Producing Unit 654,000 m3N / day
  • Hydrogen Purification Unit 600,000 m3N / day
  • No.1 Sulfur Recovery Unit 80 t / day
  • No.2 Sulfur Recovery Unit 185 t / day
  • Propylene Splitter Unit 1,400 barrels / day
  • Gas Washing Unit 300,000 m3N / day
  • Tail Gas Treating Unit 840,000 m3N / day
  • Liquified Carbon Dioxide Unit 100 t / day
  • FCC Gasoline Hydrodesulfurization Unit 12,000 barrels / day
  • Light Naphtha Merox Unit 5,000 barrels / day

Terminal Capacity

  • Crude Oil: 709,000kl
  • Refined Products: 892,900kl

Crude Supply

  • Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait

Products Produced

  • LPG, gasoline, jet fuel, diesel

Projects

  • Cosmo plans to convert the refinery into a terminal

Other Information

  • The refinery has been closed down

History

  • 1972 - Refinery commissioned
  • 1980 - Residuum Hydrodesulfurization & Hydrogen units commissioned
  • 2010 - Nameplate capacity reduced by 30,000 to 110,000 bbl/day
  • 2012 - Cosmo announces it is to close the refinery in 2013
  • 2013 - Refinery closed down

Links

  1. Cosmo Oil, Sakaide Refinery
  2. [[[Chiyoda Hydrogen Manufacturing Units]]]
  3. [[[Chiyoda Residuum Hydrodesulfurization Units]]]
  4. [[[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]]
  5. Reduction of CDU Nameplate Capacity
  6. Restructuring of Cosmo Oil Refinery Supply
  7. Cosmo Oil, Implementation of Restructuring of Refinery Supply