Difference between revisions of "Sakai Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Cosmo Oil Website: http://www.cosmo-oil.co.jp/ Location: OSAKA, Japan Capacity: 5.0 million tons/annum & 100,000 bbl/day Nelson Complexity: Refi...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Cosmo Oil
+
* Ownership: Cosmo Oil
Website: http://www.cosmo-oil.co.jp/
+
* Website: http://www.cosmo-oil.co.jp/
Location: OSAKA, Japan
+
* Location: OSAKA, Japan
Capacity: 5.0 million tons/annum & 100,000 bbl/day
+
* Capacity: 5.0 million tons/annum & 100,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Refining Units
+
=== Refining Units ===
Atmospheric Distillation - 100,000 barrels / day
+
* Atmospheric Distillation - 100,000 barrels / day
Vacuum Distillation Unit 45,000 barrels / day
+
* Vacuum Distillation Unit 45,000 barrels / day
Catalytic Reforming Unit 8,000 barrels / day
+
* Catalytic Reforming Unit 8,000 barrels / day
Reformate Splitter 10,000 barrels / day
+
* Reformate Splitter 10,000 barrels / day
Naphtha Hydrodesulfurization Unit 11,000 barrels / day
+
* Naphtha Hydrodesulfurization Unit 11,000 barrels / day
Kerosene Hydrodesulfurization Unit 15,000 barrels / day
+
* Kerosene Hydrodesulfurization Unit 15,000 barrels / day
Gas Oil Hydrodesulfurization Unit 17,500 barrels / day
+
* Gas Oil Hydrodesulfurization Unit 17,500 barrels / day
No.2 Gas Oil Hydrodesulfurization Unit 25,000 barrels / day
+
* No.2 Gas Oil Hydrodesulfurization Unit 25,000 barrels / day
Vacuum Gas Oil Hydrodesulfurization Unit 21,000 barrels / day
+
* Vacuum Gas Oil Hydrodesulfurization Unit 21,000 barrels / day
Hydrogen Producing Unit 350,000 m3N / day
+
* Hydrogen Producing Unit 350,000 m3N / day
No.2 Hydrogen Producing Unit 1,200,000 m3N / day
+
* No.2 Hydrogen Producing Unit 1,200,000 m3N / day
Fluid Catalytic Cracking Unit 24,000 barrels / day
+
* Fluid Catalytic Cracking Unit 24,000 barrels / day
FCCGasoline Hydrodesulfurization Unit 14,000 barrels / day
+
* FCC Gasoline Hydrodesulfurization Unit 14,000 barrels / day
ETBE Unit 1,850 barrels / day
+
* ETBE Unit 1,850 barrels / day
Alkylation Unit 8,000 barrels / day
+
* Alkylation Unit 8,000 barrels / day
No.2 Sulfur Recovery Unit 70 t / day
+
* No.2 Sulfur Recovery Unit 70 t / day
No.3 Sulfur Recovery Unit 70 t / day
+
* No.3 Sulfur Recovery Unit 70 t / day
No.4 Sulfur Recovery Unit 150 t / day
+
* No.4 Sulfur Recovery Unit 150 t / day
Tail Gas Treating Unit 356,000 m3N / day
+
* Tail Gas Treating Unit 356,000 m3N / day
Gasoline Splitter 7,600 barrels / day
+
* Gasoline Splitter 7,600 barrels / day
Delayed Coker Unit 25,000 barrels / day
+
* Delayed Coker Unit 25,000 barrels / day
UOP Coker Naphtha Distillate Unionfining Unit 42,000 barrels / day
+
* UOP Coker Naphtha Distillate Unionfining Unit 42,000 barrels / day
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil: 737,730kl
+
* Crude Oil: 737,730kl
Refined Products: 946,644kl
+
* Refined Products: 946,644kl
Crude Supply
+
=== Crude Supply ===
Crude is primarily supplied from the Middle East, including UAE, Saudi Arabia, Qatar, Iran & Kuwait
+
* Crude is primarily supplied from the Middle East, including UAE, Saudi Arabia, Qatar, Iran & Kuwait
Products Produced
+
=== Products Produced ===
Naphtha, jet fuels, and diesel oil
+
* Naphtha, jet fuels, and diesel oil
Ongoing Projects
+
=== Projects ===
The Sakai Refinery Upgrade Project was completed in 2010
+
* The [[Sakai Refinery Upgrade Project]] was completed in 2010
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
1968- Refinery Commissioned
+
* 1968- Refinery Commissioned
1996 - Gasoil Hydrotreater commissioned
+
* 1996 - Gasoil Hydrotreater commissioned
2010 - Nameplate capacity increased by 20,000 to 100,000 bbl/day
+
* 2010 - Nameplate capacity increased by 20,000 to 100,000 bbl/day
2010 - Completion of the Delayed Coker Unit Project
+
* 2010 - Completion of the Delayed Coker Unit Project
Relevant Links
+
* 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
Sakai Refinery, Cosmo Oil
+
* 2019- Coker capacity increased
Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
+
 
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
=== Links ===
Chiyoda Sour Water Stripping Units
+
# [http://www.cosmo-oil.co.jp/eng/company/sakai.html Sakai Refinery, Cosmo Oil]
Chiyoda H2S Removal Units With Amine
+
# [[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]
Completion ceremony for Coker Unit
+
# [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]
Reduction of CDU Nameplate Capacity
+
# [[Chiyoda Sour Water Stripping Units]]
Cosmo Oil, Implementation of Restructuring of Refinery Supply
+
# [[Chiyoda H2S Removal Units With Amine]]
 +
# [[Foster Wheeler Delayed Cokers]]
 +
# [http://www.cosmo-oil.co.jp/eng/press/100218/index.html Completion ceremony for Coker Unit]
 +
# [http://killajoules.wikidot.com/archive:reduction-of-cdu-nameplate-capacity Reduction of CDU Nameplate Capacity]
 +
# [http://killajoules.wikidot.com/blog:4415 Cosmo Oil, Implementation of Restructuring of Refinery Supply]
 +
# [https://abarrelfull.blogspot.com/2022/01/execution-of-memorandum-of.html Execution of Memorandum of Understanding regarding Business Integration]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:Japan]]
 +
[[category:Eneos]]

Latest revision as of 16:55, 25 January 2022

Summary Information

  • Ownership: Cosmo Oil
  • Website: http://www.cosmo-oil.co.jp/
  • Location: OSAKA, Japan
  • Capacity: 5.0 million tons/annum & 100,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Refining Units

  • Atmospheric Distillation - 100,000 barrels / day
  • Vacuum Distillation Unit 45,000 barrels / day
  • Catalytic Reforming Unit 8,000 barrels / day
  • Reformate Splitter 10,000 barrels / day
  • Naphtha Hydrodesulfurization Unit 11,000 barrels / day
  • Kerosene Hydrodesulfurization Unit 15,000 barrels / day
  • Gas Oil Hydrodesulfurization Unit 17,500 barrels / day
  • No.2 Gas Oil Hydrodesulfurization Unit 25,000 barrels / day
  • Vacuum Gas Oil Hydrodesulfurization Unit 21,000 barrels / day
  • Hydrogen Producing Unit 350,000 m3N / day
  • No.2 Hydrogen Producing Unit 1,200,000 m3N / day
  • Fluid Catalytic Cracking Unit 24,000 barrels / day
  • FCC Gasoline Hydrodesulfurization Unit 14,000 barrels / day
  • ETBE Unit 1,850 barrels / day
  • Alkylation Unit 8,000 barrels / day
  • No.2 Sulfur Recovery Unit 70 t / day
  • No.3 Sulfur Recovery Unit 70 t / day
  • No.4 Sulfur Recovery Unit 150 t / day
  • Tail Gas Treating Unit 356,000 m3N / day
  • Gasoline Splitter 7,600 barrels / day
  • Delayed Coker Unit 25,000 barrels / day
  • UOP Coker Naphtha Distillate Unionfining Unit 42,000 barrels / day

Terminal Capacity

  • Crude Oil: 737,730kl
  • Refined Products: 946,644kl

Crude Supply

  • Crude is primarily supplied from the Middle East, including UAE, Saudi Arabia, Qatar, Iran & Kuwait

Products Produced

  • Naphtha, jet fuels, and diesel oil

Projects

Other Information

-

History

  • 1968- Refinery Commissioned
  • 1996 - Gasoil Hydrotreater commissioned
  • 2010 - Nameplate capacity increased by 20,000 to 100,000 bbl/day
  • 2010 - Completion of the Delayed Coker Unit Project
  • 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
  • 2019- Coker capacity increased

Links

  1. Sakai Refinery, Cosmo Oil
  2. Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
  3. Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
  4. Chiyoda Sour Water Stripping Units
  5. Chiyoda H2S Removal Units With Amine
  6. Foster Wheeler Delayed Cokers
  7. Completion ceremony for Coker Unit
  8. Reduction of CDU Nameplate Capacity
  9. Cosmo Oil, Implementation of Restructuring of Refinery Supply
  10. Execution of Memorandum of Understanding regarding Business Integration