Saguaro Connector Gas Pipeline
Revision as of 15:51, 30 December 2022 by Abarrelfull (talk | contribs)
Summary Information
- Source: Waha gas hub, Texas
- Destination:
- Ownership: Oneok
- Website:
- Length: kilometres (155 miles)
- Capacity: per day
- Status: (Operating/Planned/Under Construction)
Details
- The potential Saguaro Connector Pipeline would consist of approximately 155 miles of 48-inch-diameter natural gas pipeline originating at the Waha Hub in Pecos County, Texas. The ultimate design capacity of the potential pipeline would be approximately 2.8 billion cubic feet per day.
- Final investment decision on the potential pipeline is expected by mid-2023
- The pipeline will connect at the International Boundary with a new pipeline under development in Mexico for delivery to an export facility on the West Coast of Mexico
History
- 2022 - Presidential Permit application filed with the Federal Energy Regulatory Commission for construction of the international connector
Other Information
- -