From A Barrel Full
SK408 Block Gas and Condensate Fields
Jump to navigation
Jump to search
Summary Information
- Operator: SapuraOMV
- Country: Maslaysia
- Location: Offshore Sarawak
- Production start: 2019
- Partners: Shell, Petronas
- Type: Gas & Condensate
- Estimated Reserves:
- Production Volume:
Description
- The project includes five natural gas and condensate fields, Gorek, Larak, Bakong, Teja, and Legundi.
- The Jerun platform is designed to produce up to 550 million cubic feet of gas per day, with condensate production of 15,000 barrels per day during peak production.
- The gas is supplied to the Malaysia LNG Terminal
Contractors
- McDermott:
- Transportation and installation of jackets, topsides and pipelines for the Gorek gas field
- Transportation and installation of jackets, topsides and pipelines for the Larak and Bakong gas fields.
- Fabrication of risers and spools
History
- 2012 - Signed Production Sharing Contract for Block SK408 offshore
- 2014 - Gas discoveries at Bakong Teja, Gorek, Legundi & Larak prospects
- 2016 - Gas discoveries at Jerun & Jerimin
- 2019 - First Gas from Larak field
- 2020 - Gorek, Larak and Bakong came onstream
- 2021 - FID for the Jerun field
- 2024 - First gas achieved at Jerun gas field
Geology
Links
- OMV, Malaysia
- McDermott Announces Contracts for Pan Malaysia Field Development
- SapuraOMV announces Bakong first production from SK408 gas fields
- First gas achieved at Jerun gas field in Malaysia