(Created page with "=== Summary Information === Ownership: Sinochem Website: http://www.sinochem.com/ Wiki Page: Quanzhou Fujian Refinery Location: Quanzhou, Fujian, China Capacity: 12.0 mill...")
 
Line 35: Line 35:
 
Products Produced
 
Products Produced
 
Gasoline, Diesel, Jet Fuel, Petrocoke
 
Gasoline, Diesel, Jet Fuel, Petrocoke
== History ===
+
=== History ===
2005 - Sinochem Group made the decision to build an oil refinery in Quanzhou
+
* 2005 - Sinochem Group made the decision to build an oil refinery in Quanzhou
2006 - Sinochem Quanzhou Petrochemical Co., Ltd. (Sinochem Quanzhou) was incorporated
+
* 2006 - Sinochem Quanzhou Petrochemical Co., Ltd. (Sinochem Quanzhou) was incorporated
2008 - Sinochem Group obtained the approval from the National Energy Administration for preparatory tasks of the project
+
* 2008 - Sinochem Group obtained the approval from the National Energy Administration for preparatory tasks of the project
2011 - Sinochem Group’s Environment Impact Assessment Report on the project was approved by the Ministry of Environmental Protection.
+
* 2011 - Sinochem Group’s Environment Impact Assessment Report on the project was approved by the Ministry of Environmental Protection.
2012 - UOP awarded hydrogen unit licence
+
* 2012 - UOP awarded hydrogen unit licence
2013 - First crude cargo arrives
+
* 2013 - First crude cargo arrives
2014 - Testing begins
+
* 2014 - Testing begins
2014 - Commercial operations begin
+
* 2014 - Commercial operations begin
Other Information
+
=== Other Information ===
 
-
 
-
 
=== Links ===
 
=== Links ===

Revision as of 10:25, 3 October 2020

Summary Information

Ownership: Sinochem Website: http://www.sinochem.com/ Wiki Page: Quanzhou Fujian Refinery Location: Quanzhou, Fujian, China Capacity: 12.0 million tons/annum & 240,000 bbl/day Nelson Complexity: Project Stage: Under Construction Expected Completion: 2014 Budget: The Project Project Type: Greenfield Refinery Project Summary: Main Contractors Foster Wheeler: Supply Circulating Fluidized-Bed Steam Generators Licences UOP: Hydrogen Unit

    • Dupont: ULSD Hydrotreater

Refining Units Atmospheric Distillation Vacuum Distillation Unit Fluidised Catalytic Cracker Hydrocracker Coker Hydrogen Unit - UOP Aromatics extraction unit Isomerization unit Sulfur recovery integrated unit Terminal Capacity Crude Oil: Refined Products: Crude Supply The refinery will primarily process Middle Eastern Crudes The first cargo was however delivered from Angola Products Produced Gasoline, Diesel, Jet Fuel, Petrocoke

History

  • 2005 - Sinochem Group made the decision to build an oil refinery in Quanzhou
  • 2006 - Sinochem Quanzhou Petrochemical Co., Ltd. (Sinochem Quanzhou) was incorporated
  • 2008 - Sinochem Group obtained the approval from the National Energy Administration for preparatory tasks of the project
  • 2011 - Sinochem Group’s Environment Impact Assessment Report on the project was approved by the Ministry of Environmental Protection.
  • 2012 - UOP awarded hydrogen unit licence
  • 2013 - First crude cargo arrives
  • 2014 - Testing begins
  • 2014 - Commercial operations begin

Other Information

-

Links

  1. Dupont Refinery Project References
  2. Foster Wheeler To Supply Circulating Fluidized-Bed Steam Generators To SINOCHEM In The People's Republic Of China
  3. Sinochem Group’s 12-million-ton-per-annum Oil Refining Project Officially Approved
  4. Honeywell’s UOP technology selected by Sinochem to produce high-purity hydrogen
  5. Sinochem Quanzhou Petrochemical Completes the Construction of the First Batch of Eight Sets of Units
  6. All Large Equipments Installed in Sinochem Quanzhou Petrochemical Co., Ltd.
  7. The First Ship of Crude Oil Imported by Sinochem Quanzhou Petrochemical Smoothly Reached Its Destination and Unloaded
  8. Sinochem Quanzhou Petrochemical’s 12 Million Tons per Annum Oil Refining Project Enters into Overall Testing Run Stage upon the Successful Trial Running of Atmospheric and Vacuum Distillation Unit
  9. Sinochem’s 12 Million MT/a Refining Project Commissioned - All Its Gasoline and Diesel Products Meet Euro V Emission Standards