Difference between revisions of "Qalhat LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: Qalhat LNG, * Government of Oman (46.84%) * Oman LNG L.L.C (36.80%) * Union Fenosa Gas S.A. (7.36%) * Itochu (3%) * Mitsubishi Corporat...")
 
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: Qalhat LNG,  
 
* Ownership: Qalhat LNG,  
* Government of Oman (46.84%)
+
** Government of Oman (46.84%)
* Oman LNG L.L.C (36.80%)
+
** Oman LNG L.L.C (36.80%)
* Union Fenosa Gas S.A. (7.36%)
+
** Union Fenosa Gas S.A. (7.36%)
* Itochu (3%)
+
** Itochu (3%)
* Mitsubishi Corporation (3%)
+
** Mitsubishi Corporation (3%)
* Osaka Gas (3%)
+
** Osaka Gas (3%)
 
* Website: http://www.qalhatlng.com
 
* Website: http://www.qalhatlng.com
 
* Location: Qalhat  
 
* Location: Qalhat  
Line 13: Line 13:
 
* Status: In Operation  
 
* Status: In Operation  
  
+++ Brief Description
+
=== Brief Description ===
* A single train liquifaction plant
+
* A single train liquefaction plant
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
 
* Constructor:  
 
* Constructor:  
* **Chiyoda:** FEED
+
** '''Chiyoda:''' FEED
* **Chiyoda-Foster Wheeler:** Detailed engineering, procurement and construction (EPC)
+
** '''Chiyoda-Foster Wheeler:''' Detailed engineering, procurement and construction (EPC)
* **DYWIDAG:** Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
+
** '''DYWIDAG:''' Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
 
* Licensor:
 
* Licensor:
  
+++ History
+
=== History ===
 
* 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)  
 
* 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)  
 
* 2005 - First cargo is shipped from the terminal to Spain
 
* 2005 - First cargo is shipped from the terminal to Spain
 
* 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG
 
* 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
 
* -
 
* -
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
  * Among the fields supplying the terminal are the [[[Saih Nihayda Gas And Condensate Field]]], the [[[Barik Gas Field]]] and the [[[Saih Rawl Gas Field]]]
+
  * Among the fields supplying the terminal are the [[Saih Nihayda Gas And Condensate Field]], the [[Barik Gas Field]] and the [[Saih Rawl Gas Field]]
 
* Customers:  
 
* Customers:  
 
  * Union Fenosa Gas 1.65 mtpa
 
  * Union Fenosa Gas 1.65 mtpa
Line 40: Line 40:
 
  * Osaka Gas 0.8 mtpa.
 
  * Osaka Gas 0.8 mtpa.
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Relevant Links
+
=== Links ===
 
# [http://www.qalhatlng.com/aboutus_qlng_profile.shtml Terminal Profile]
 
# [http://www.qalhatlng.com/aboutus_qlng_profile.shtml Terminal Profile]
# [[[DYWIDAG LNG Tank References]]]
+
# [[DYWIDAG LNG Tank References]]
# [[[Chiyoda LNG References]]]
+
# [[Chiyoda LNG References]]
 
# [http://killajoules.wikidot.com/archive:chiyoda-secured-lng-train-epc-contract-in-oman Chiyoda Secured LNG Train EPC Contract in Oman]
 
# [http://killajoules.wikidot.com/archive:chiyoda-secured-lng-train-epc-contract-in-oman Chiyoda Secured LNG Train EPC Contract in Oman]
 
# [http://killajoules.wikidot.com/archive:chiyoda-foster-wheeler-secures-lng-train-epc-contrac Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman]
 
# [http://killajoules.wikidot.com/archive:chiyoda-foster-wheeler-secures-lng-train-epc-contrac Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman]
 
# [http://killajoules.wikidot.com/archive:acquisition-of-equity-interest-in-qalhat-lng Acquisition of Equity Interest in Qalhat LNG]
 
# [http://killajoules.wikidot.com/archive:acquisition-of-equity-interest-in-qalhat-lng Acquisition of Equity Interest in Qalhat LNG]

Latest revision as of 17:16, 28 April 2024

Summary Information

  • Ownership: Qalhat LNG,
    • Government of Oman (46.84%)
    • Oman LNG L.L.C (36.80%)
    • Union Fenosa Gas S.A. (7.36%)
    • Itochu (3%)
    • Mitsubishi Corporation (3%)
    • Osaka Gas (3%)
  • Website: http://www.qalhatlng.com
  • Location: Qalhat
  • Capacity: 3.3 million tons/annum
  • Status: In Operation

Brief Description

  • A single train liquefaction plant

Technical Details

  • Storage capacity:
  • Constructor:
    • Chiyoda: FEED
    • Chiyoda-Foster Wheeler: Detailed engineering, procurement and construction (EPC)
    • DYWIDAG: Full containment tank, Design & Build, Capacity: 2 x 120,000 m³
  • Licensor:

History

  • 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)
  • 2005 - First cargo is shipped from the terminal to Spain
  • 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG

Ongoing Projects/Project Status

  • -

Suppliers / Customers

  • Suppliers:
* Among the fields supplying the terminal are the Saih Nihayda Gas And Condensate Field, the Barik Gas Field and the Saih Rawl Gas Field
  • Customers:
* Union Fenosa Gas 1.65 mtpa
* Mitsubishi Corporation 0.8 mtpa
* Osaka Gas 0.8 mtpa.

Other Information

  • -

Links

  1. Terminal Profile
  2. DYWIDAG LNG Tank References
  3. Chiyoda LNG References
  4. Chiyoda Secured LNG Train EPC Contract in Oman
  5. Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman
  6. Acquisition of Equity Interest in Qalhat LNG