Summary Information

  • Ownership: Sempra
  • Website: www.sempra.com
  • Location: Port Arthur, Texas, USA
  • Capacity: 13.5 million tons/annum
  • Status: Planned

Brief Description

  • The project was previously an import terminal, Port Arthur LNG Terminal
  • The proposed liquefaction project is designed to include: two natural gas liquefaction trains with a total export capability of approximately 13.5 million tons per annum, or 1.4 billion cubic feet per day; two 160,000-cubic-meter storage tanks; marine facilities for vessel berthing and loading; natural gas liquids and refrigerant storage; feed gas pre-treatment; truck loading and unloading areas; and combustion turbine generators for self-generation of electrical power.

Technical Details

  • Storage capacity: two 160,000-cubic-meter storage tanks
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 201X
  • Bechtel signed a fixed-price engineering, procurement and construction (EPC) contract

Suppliers / Customers

  • Suppliers:
  • Customers:
    • PGNIG will take 2.0 tpa

History

  • 2015 - Sempra Energy Submits For Pre-File Review With FERC
  • 2018 - PGNIG signed an agreement for 2.0 million tpa of LNG
  • 2020 - Bechtel signed and EPC contract for the project

Other Information

  • -

Links

  1. Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC
  2. Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas
  3. PGNiG: another long-term contract for the American LNG signed
  4. Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement