Difference between revisions of "Port Arthur LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 34: Line 34:
 
# [http://killajoules.wikidot.com/blog:5804 Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC]
 
# [http://killajoules.wikidot.com/blog:5804 Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC]
 
# [http://killajoules.wikidot.com/blog:5932 Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas]
 
# [http://killajoules.wikidot.com/blog:5932 Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas]
 +
# [  PGNiG: another long-term contract for the American LNG signed]
 
# [https://abarrelfull.blogspot.com/2021/11/sempra-energy-subsidiary-port-arthur.html Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement]
 
# [https://abarrelfull.blogspot.com/2021/11/sempra-energy-subsidiary-port-arthur.html Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement]

Revision as of 08:58, 16 November 2021

Summary Information

  • Ownership: Sempra
  • Website: www.sempra.com
  • Location: Port Arthur, Texas, USA
  • Capacity: 13.5 million tons/annum
  • Status: Planned

Brief Description

  • The project was previously an import terminal, Port Arthur LNG Terminal
  • The proposed liquefaction project is designed to include: two natural gas liquefaction trains with a total export capability of approximately 13.5 million tons per annum, or 1.4 billion cubic feet per day; two 160,000-cubic-meter storage tanks; marine facilities for vessel berthing and loading; natural gas liquids and refrigerant storage; feed gas pre-treatment; truck loading and unloading areas; and combustion turbine generators for self-generation of electrical power.

Technical Details

  • Storage capacity: two 160,000-cubic-meter storage tanks
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 201X
  • Bechtel signed a fixed-price engineering, procurement and construction (EPC) contract

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2015 - Sempra Energy Submits For Pre-File Review With FERC
  • 2020 - Bechtel signed and EPC contract for the project

Other Information

  • -

Links

  1. Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC
  2. Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas
  3. [ PGNiG: another long-term contract for the American LNG signed]
  4. Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement