Difference between revisions of "Port Arthur LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 32: Line 32:
 
# [http://killajoules.wikidot.com/blog:5804 Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC]
 
# [http://killajoules.wikidot.com/blog:5804 Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC]
 
# [http://killajoules.wikidot.com/blog:5932 Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas]
 
# [http://killajoules.wikidot.com/blog:5932 Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas]
# [ Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement]
+
# [https://abarrelfull.blogspot.com/2021/11/sempra-energy-subsidiary-port-arthur.html Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement]

Revision as of 08:54, 16 November 2021

Summary Information

  • Ownership: Sempra
  • Website: www.sempra.com
  • Location: Port Arthur, Texas, USA
  • Capacity: 10 million tons/annum
  • Status: Planned

Brief Description

  • The project was previously an import terminal, Port Arthur LNG Terminal
  • The proposed liquefaction project is designed to include: two natural gas liquefaction trains with a total export capability of approximately 10 million tons per annum, or 1.4 billion cubic feet per day; two 160,000-cubic-meter storage tanks; marine facilities for vessel berthing and loading; natural gas liquids and refrigerant storage; feed gas pre-treatment; truck loading and unloading areas; and combustion turbine generators for self-generation of electrical power.

Technical Details

  • Storage capacity: two 160,000-cubic-meter storage tanks
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 201X

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2015 - Sempra Energy Submits For Pre-File Review With FERC

Other Information

  • -

Links

  1. Sempra Energy Submits Port Arthur Liquefaction-Export Facilities For Pre-File Review With FERC
  2. Sempra LNG And Woodside Sign Memorandum Of Understanding For Potential Development Of Natural Gas Liquefaction Facility At Port Arthur, Texas
  3. Sempra Energy Subsidiary Port Arthur LNG and Bechtel Sign EPC Agreement