Difference between revisions of "Pluto LNG Phase II Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5% * Website: http://www.woodside.com.au * Location: Burrup Peninsula, Western...") |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
− | * Suppliers: The primary source of gas for the expansion will come from the [[Scarborough Gas Field]] | + | * Suppliers: The primary source of gas for the expansion will come from the [[Scarborough Gas Field]]. It will be connected by an approximately 430 km pipeline. |
− | * Customers: | + | * Customers: |
=== History === | === History === |
Revision as of 09:16, 15 December 2021
Contents
Summary Information
- Ownership: Woodside 90% (operator); Tokyo Gas 5%; Kansai Electric 5%
- Website: http://www.woodside.com.au
- Location: Burrup Peninsula, Western Australia
- Capacity: 5.0 million tons/annum
- Status: Planned
Brief Description
- The construction of Pluto Train 2 will expand Pluto’s existing processing capacity by around five million tonnes per annum and allow for the processing of third-party gas resources.
Technical Details
- Storage capacity:
- Constructor:
- Sembcorp Marine:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers: The primary source of gas for the expansion will come from the Scarborough Gas Field. It will be connected by an approximately 430 km pipeline.
- Customers: