* 2009 - New crude unloading facilities commissioned | * 2009 - New crude unloading facilities commissioned | ||
* 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit | * 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit | ||
+ | * 2012 - Expansion and upgrade project completed | ||
+ | |||
=== Links === | === Links === | ||
# [https://rompetrol-rafinare.kmginternational.com/en/rompetrol-rafinare/petromidia-refinery Refinery webpage] | # [https://rompetrol-rafinare.kmginternational.com/en/rompetrol-rafinare/petromidia-refinery Refinery webpage] | ||
Line 43: | Line 45: | ||
[[Category:Refinery]] | [[Category:Refinery]] | ||
[[Category:Romania]] | [[Category:Romania]] | ||
+ | [[Category:KMG]] |
Revision as of 11:35, 9 October 2023
Contents
Summary Information
- Ownership: Rompetrol
- Website: https://rompetrol-rafinare.kmginternational.com/
- Location: Constanza, Romania
- Capacity: 5.0 million tons/annum & 100,000 bbl/day
- Nelson Complexity: 11.4
- Refining Depth: 85%
Refining Units
- Atmospheric Distillation
- Delayed Coker - 22,000 bpd
- Mild Hydrocracker
- Fluidised Catalytic Cracker
- Sulphur Recovery Unit
- Hydrogen Unit - 40,000 normal m3/hour - Technip
Terminal Capacity
- Crude Oil:
- * Refined Products:
Crude Supply
-
Products Produced
Gasoline, diesel and LPG and Jet A-1 fuel. Euro V diesel is produced.
Projects
- A major modernisation project was completed in 2012
- For details see Petromidia Refinery Upgrade Project
Other Information
- Petromidia is the only Romanian refinery located at the Black Sea shore, thus having the advantage of being supplied directly through the oil terminal located in the Port of Midia
History
- 1975 - Construction begins
- 1977 - Refinery commissioned
- 2008 - Refinery launches production of Euro V diesel
- 2009 - New crude unloading facilities commissioned
- 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit
- 2012 - Expansion and upgrade project completed
Links
- Refinery webpage
- Foster Wheeler Delayed Cokers
- ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania
- Technip awarded contract for a hydrogen plant in Romania
- Rompetrol Rafinare and Rompetrol Petrochemicals have successfully recommissioned the installations on the Petromidia Platform
- Rompetrol – the first crude oil vessel unloaded through the new sea terminal
- Rompetrol Refining Shifts to the Euro 5 Standard