Difference between revisions of "Petromidia Constanza Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 34: Line 34:
 
=== Links ===
 
=== Links ===
 
# [https://rompetrol-rafinare.kmginternational.com/en/rompetrol-rafinare/petromidia-refinery Refinery webpage]
 
# [https://rompetrol-rafinare.kmginternational.com/en/rompetrol-rafinare/petromidia-refinery Refinery webpage]
 +
# [[Foster Wheeler Delayed Cokers]]
 
# [http://www.conocophillips.com/EN/newsroom/news_releases/2010news/Pages/07-09-2010.aspx ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania]
 
# [http://www.conocophillips.com/EN/newsroom/news_releases/2010news/Pages/07-09-2010.aspx ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-for-a-hydrogen-plant-in-rom Technip awarded contract for a hydrogen plant in Romania]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-for-a-hydrogen-plant-in-rom Technip awarded contract for a hydrogen plant in Romania]

Revision as of 08:35, 30 March 2020

Summary Information

Refining Units

  • Atmospheric Distillation
  • Delayed Coker - 22,000 bpd
  • Mild Hydrocracker
  • Fluidised Catalytic Cracker
  • Sulphur Recovery Unit
  • Hydrogen Unit - 40,000 normal m3/hour - Technip

Terminal Capacity

  • Crude Oil:
  • * Refined Products:

Crude Supply

-

Products Produced

Gasoline, diesel and LPG and Jet A-1 fuel. Euro V diesel is produced.

Projects

Other Information

  • Petromidia is the only Romanian refinery located at the Black Sea shore, thus having the advantage of being supplied directly through the oil terminal located in the Port of Midia

History

  • 1975 - Construction begins
  • 1977 - Refinery commissioned
  • 2008 - Refinery launches production of Euro V diesel
  • 2009 - New crude unloading facilities commissioned
  • 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit

Links

  1. Refinery webpage
  2. Foster Wheeler Delayed Cokers
  3. ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania
  4. Technip awarded contract for a hydrogen plant in Romania
  5. Rompetrol Rafinare and Rompetrol Petrochemicals have successfully recommissioned the installations on the Petromidia Platform
  6. Rompetrol – the first crude oil vessel unloaded through the new sea terminal
  7. Rompetrol Refining Shifts to the Euro 5 Standard