Difference between revisions of "Petromidia Constanza Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 4: Line 4:
 
* Location: Constanza, Romania
 
* Location: Constanza, Romania
 
* Capacity: 5.0 million tons/annum & 100,000 bbl/day
 
* Capacity: 5.0 million tons/annum & 100,000 bbl/day
* Nelson Complexity: 10.7
+
* Nelson Complexity: 11.4
* Refining Depth:
+
* Refining Depth: 85%
  
 
=== Refining Units ===
 
=== Refining Units ===
Atmospheric Distillation
+
* Atmospheric Distillation
Delayed Coker - 22,000 bpd
+
* Delayed Coker - 22,000 bpd
Mild Hydrocracker
+
* Mild Hydrocracker
Fluidised Catalytic Cracker
+
* Fluidised Catalytic Cracker
Sulphur Recovery Unit
+
* Sulphur Recovery Unit
Hydrogen Unit - 40,000 normal m3/hour - Technip
+
* Hydrogen Unit - 40,000 normal m3/hour - Technip
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
Refined Products:
+
* * Refined Products:
 
=== Crude Supply ===
 
=== Crude Supply ===
 
-
 
-
Line 22: Line 22:
 
Gasoline, diesel and LPG and Jet A-1 fuel. Euro V diesel is produced.
 
Gasoline, diesel and LPG and Jet A-1 fuel. Euro V diesel is produced.
 
=== Projects ===
 
=== Projects ===
For details see [[Petromidia Refinery Upgrade Project]]
+
* A major modernisation project was completed in 2012
The coker is currently being revamped.
+
* For details see [[Petromidia Refinery Upgrade Project]]
 
=== Other Information ===
 
=== Other Information ===
Petromidia is the only Romanian refinery located at the Black Sea shore, thus having the advantage of being supplied directly through the oil terminal located in the Port of Midia
+
* Petromidia is the only Romanian refinery located at the Black Sea shore, thus having the advantage of being supplied directly through the oil terminal located in the Port of Midia
 
=== History ===
 
=== History ===
1975 - Construction begins
+
* 1975 - Construction begins
1977 - Refinery commissioned
+
* 1977 - Refinery commissioned
2008 - Refinery launches production of Euro V diesel
+
* 2008 - Refinery launches production of Euro V diesel
2009 - New crude unloading facilities commissioned
+
* 2009 - New crude unloading facilities commissioned
2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit
+
* 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit
 
=== Links ===
 
=== Links ===
 +
# [https://rompetrol-rafinare.kmginternational.com/en/rompetrol-rafinare/petromidia-refinery Refinery webpage]
 
# [http://www.conocophillips.com/EN/newsroom/news_releases/2010news/Pages/07-09-2010.aspx ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania]
 
# [http://www.conocophillips.com/EN/newsroom/news_releases/2010news/Pages/07-09-2010.aspx ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-for-a-hydrogen-plant-in-rom Technip awarded contract for a hydrogen plant in Romania]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-for-a-hydrogen-plant-in-rom Technip awarded contract for a hydrogen plant in Romania]

Revision as of 19:08, 18 March 2020

Summary Information

Refining Units

  • Atmospheric Distillation
  • Delayed Coker - 22,000 bpd
  • Mild Hydrocracker
  • Fluidised Catalytic Cracker
  • Sulphur Recovery Unit
  • Hydrogen Unit - 40,000 normal m3/hour - Technip

Terminal Capacity

  • Crude Oil:
  • * Refined Products:

Crude Supply

-

Products Produced

Gasoline, diesel and LPG and Jet A-1 fuel. Euro V diesel is produced.

Projects

Other Information

  • Petromidia is the only Romanian refinery located at the Black Sea shore, thus having the advantage of being supplied directly through the oil terminal located in the Port of Midia

History

  • 1975 - Construction begins
  • 1977 - Refinery commissioned
  • 2008 - Refinery launches production of Euro V diesel
  • 2009 - New crude unloading facilities commissioned
  • 2010 - Major revamp completed, including retooling of the Catalytic Cracking unit, modernization of the Gas Desulphurization and Sulphur Recovery unit

Links

  1. Refinery webpage
  2. ConocoPhillips, Rompetrol Rafinare S.A. and Rominserv S.A. Announce License and Technical Services Agreement for Delayed Coking Unit Revamp for the Rompetrol Petromidia Refinery, Romania
  3. Technip awarded contract for a hydrogen plant in Romania
  4. Rompetrol Rafinare and Rompetrol Petrochemicals have successfully recommissioned the installations on the Petromidia Platform
  5. Rompetrol – the first crude oil vessel unloaded through the new sea terminal
  6. Rompetrol Refining Shifts to the Euro 5 Standard