Difference between revisions of "Pengerang Johor RAPID Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 45: Line 45:
 
# [http://killajoules.wikidot.com/blog:2524 Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project]
 
# [http://killajoules.wikidot.com/blog:2524 Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project]
 
# [https://abarrelfull.blogspot.com/2021/03/malaysia-mega-refinery-project-receives.html Malaysia mega-refinery project receives first crude oil cargo]
 
# [https://abarrelfull.blogspot.com/2021/03/malaysia-mega-refinery-project-receives.html Malaysia mega-refinery project receives first crude oil cargo]
 +
 +
[[Category:Refinery]]
 +
[[Category:Malaysia]]
 +
[[Category:Petronas]]

Revision as of 10:13, 23 March 2021

Summary Information

Brief Description

  • a high complexity crude oil refinery with a capacity of 300,000 barrels a day, a naphtha cracker, petrochemicals and polymer facilities

Refining Units

  • Atmospheric distillation
  • residual oil hydrotreatment
  • Hydrotreating units
  • Catalytic Reforming Unit
  • Hydrogen Production Units
  • Saturated Gas Plant

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • It will process imported crude
  • The first cargo was from Saudi Arabia

Products Produced

  • It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications

Ongoing Projects

Other Information

  • -

History

  • 2011 - The project is announced
  • 2012 - Project officially launched by the Sultan of Johor
  • 2018 - First oil cargo arrived at the refinery
  • 2019 - Refinery completed

Links

  1. Sultan Of Johor Launches Petronas' Refinery And Petrochemical Integrated Project
  2. Malaysia mega-refinery project receives first crude oil cargo