Difference between revisions of "Pengerang Johor RAPID Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 31: | Line 31: | ||
* It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications | * It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications | ||
=== Ongoing Projects === | === Ongoing Projects === | ||
− | * | + | * The refinery was commissioned in 2019 |
+ | * See [[Pengerang Johor Refinery Project]] for details | ||
+ | |||
=== Other Information === | === Other Information === | ||
* - | * - |
Revision as of 10:11, 23 March 2021
Contents
Summary Information
- Ownership: Petronas
- Website: http://www.petronas.com.my/
- List of Petronas Refineries
- Location: Pengerang, Johor, Malaysia
- Capacity: 15 million tons/annum & 300,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- a high complexity crude oil refinery with a capacity of 300,000 barrels a day, a naphtha cracker, petrochemicals and polymer facilities
Refining Units
- Atmospheric distillation
- residual oil hydrotreatment
- Hydrotreating units
- Catalytic Reforming Unit
- Hydrogen Production Units
- Saturated Gas Plant
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- It will process imported crude
- The first cargo was from Saudi Arabia
Products Produced
- It supplies feedstock for the petrochemical complex. It also produces a host of refined petroleum products, including gasoline and diesel that meet the Euro 4 and Euro 5 fuel specifications
Ongoing Projects
- The refinery was commissioned in 2019
- See Pengerang Johor Refinery Project for details
Other Information
- -
History
- 2011 - The project is announced
- 2012 - Project officially launched by the Sultan of Johor
- 2018 - First oil cargo arrived at the refinery
- 2019 - Refinery completed