Pavlodar Refinery Upgrade Project
Revision as of 15:19, 5 January 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: KazMunaiGas * Website: http://lang.kmg.kz/page.php?lang=2 * Wiki Page: Pavlodar Refinery * Location: Pavlodar, Kazakhstan * Capacity:...")
Summary Information
- Ownership: KazMunaiGas
- Website: http://lang.kmg.kz/page.php?lang=2
- Wiki Page: Pavlodar Refinery
- Location: Pavlodar, Kazakhstan
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage:
- Expected Completion: 2015
- Budget:
+++ The Project
- Project Type:
- Project Summary: The scope of the project includes new and revamp process units as well as utilities and offsite facilities aiming to increase production capacity and conversion
- Revamps: Crude Distillation Unit, Vacuum Distillation Unit, Kero Hydrotreater, Diesel Hydrotreater Unit, Merox, Naphta Hydrotreater, Vacuum Gas Oil, Catalytic Cracking Unit, Catalytic Reforming Unit, Utilities and Off-sites.
- New facilities: Penex isomerisation unit, Sulphur Recovery Unit, Sour Water Stripping, Amine Regeneration Unit and Diesel Hydrotreater and Dewaxing.
- Main Contractors:
- **Technip:** Front-end engineering design (FEED) services
- **UOP:** Unit Licences
+++ Refining Units
- light naphtha isomerization
- CCR Platforming
- Fluid Catalytic Cracking (FCC)
- Vacuum Gas Oil (VGO) Unionfining
- Caustic Merox
- Coker Naphtha Unionfining
- Distillate Unionfining
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- The project is designed to meet Euro-5 standards
+++ History
- 2012 - Technip awarded contract for the front-end engineering design (FEED) services
- 2013 - UOP technology selected for key units
- 2013 - Rominserv awarded major contract
+++ Other Information
- -
+++ Relevant Links