PanYu 34-1/35-1/35-2 Gas Fields
Revision as of 08:26, 16 November 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: CNOOC * Country: China * Location: * Production start: * Partners: * Type: Gas * Estimated Reserves: * Production Volume: +++ Descriptio...")
Summary Information
- Operator: CNOOC
- Country: China
- Location:
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The PY34-1 CEP is a Central Platform (CEP) to receive and process gas from PanYu 34-1/35-1/35-2 gas field.
- The processed gas will be compressed and transported to Liwan gas CEP through a 14” subsea pipeline.
+++ Contractors
- **Technip and COOEC:** Supply and installation of a 10” and a 6” diameter clad-lined pipelines, of steel tube umbilicals*, and associated equipment
- **Cameron:** Supply of six subsea production trees, production controls, one manifold, associated subsea equipment, rental tooling and service support
- **Morimatsu:** MEG module fabrication
- **Kavin Engineering:** Detailed Engineering of TEG Package
+++ History
- 2004 - Panyu 34-1 discovered
- 2012 - Subsea contracts awarded
+++ Geology
+++ Links
- Kavin Engineering Oil And Gas Processing References
- CNOOC Announces Successful Appraisal Well PY 34-1-2
- Cameron Awarded Subsea Systems Supply Contract From CNOOC For “Panyu 35-1/2” Development, Offshore China
- Technip and COOEC awarded substantial subsea contract in China
- 850-ton MEG module supplied to CNOOC’s offshore natural gas field