Difference between revisions of "P-71 FPSO"

From A Barrel Full
Jump to navigation Jump to search
 
Line 38: Line 38:
 
* 2020 - Petrobras decides to use P-71 for Itapu, not Lula
 
* 2020 - Petrobras decides to use P-71 for Itapu, not Lula
 
* 2021 - Sembcorp awarded modification contract
 
* 2021 - Sembcorp awarded modification contract
 +
* 2022 - First oil from FPSO
  
 
=== Other Information ===
 
=== Other Information ===
Line 52: Line 53:
 
# [https://abarrelfull.blogspot.com/2024/05/petrobras-on-fpso-p-71-and-development.html Petrobras on the FPSO P-71 and the development of Tupi]
 
# [https://abarrelfull.blogspot.com/2024/05/petrobras-on-fpso-p-71-and-development.html Petrobras on the FPSO P-71 and the development of Tupi]
 
# [https://abarrelfull.blogspot.com/2024/05/sembcorp-marines-brazilian-yard-secures.html Sembcorp Marine’s Brazilian Yard Secures Modification Work on Tupi B.V. FPSO P-71 for Deployment at Itapu Field]
 
# [https://abarrelfull.blogspot.com/2024/05/sembcorp-marines-brazilian-yard-secures.html Sembcorp Marine’s Brazilian Yard Secures Modification Work on Tupi B.V. FPSO P-71 for Deployment at Itapu Field]
 +
# [https://abarrelfull.blogspot.com/2024/05/petrobras-on-start-of-p-71-production.html Petrobras on the start of P-71 production]
  
 
[[category:FPSO]]
 
[[category:FPSO]]
 
[[category:Brazil]]
 
[[category:Brazil]]
 
[[category:Petrobras]]
 
[[category:Petrobras]]

Latest revision as of 09:54, 7 May 2024

Summary Information

Brief Description

  • Measuring 316m in length and 54m in width, the FPSO P-71 is capable of handling 150,000 barrels of oil per day and six million standard cubic metres of natural gas in operation. It has a storage capacity of 1.6 million barrels of oil and can accommodate 160 people.
  • It is one of 8 clones that were built
  • The vessel is a new build but was modified due to the change of use before it was commissioned.
  • Petrobras originally planned to use it on the Lula Oil Field

Contractors

  • Engevix Engenharia: Construction of the hull
  • Sembcorp Marine:
    • Construction of a total of 8 topside modules and module integration works
    • Modification for Itapu
  • Dresser-Rand: Supply of compression equipment and services
  • UOP: CO2 & Water separation Systems
  • Altus: Supply of automation systems 


Status

  • In operation

History

  • 2010 - Engevix Engenharia awarded contract for the hull
  • 2011 - Altus awarded automation contract
  • 2011 - Dresser-Rand awarded compression equipment and services contract
  • 2012 - Sembcorp Marine awarded topsides contract
  • 2012 - UOP awarded contract for gas cleaning technology
  • 2020 - Petrobras decides to use P-71 for Itapu, not Lula
  • 2021 - Sembcorp awarded modification contract
  • 2022 - First oil from FPSO

Other Information

  • -

Links

  1. Execution of Contract for the construction of pre-salt platforms
  2. Dresser-Rand Selected to Supply More Than $700 Million of Compression Systems and Related Maintenance Services for Eight FPSOs
  3. Altus Signs Automation Contract For 8 Pre-Salt Platforms
  4. Sembcorp Marine's Subsidiary Jurong Do Brasil Secures A Contract Worth Us$674 Million For FPSOS P-68 And P-71
  5. Honeywell’s UOP technology selected by Petrobras for offshore natural gas processing in Brazil
  6. Sulzer Pumps to Supply 42 Pumps to Two Floating Production Storage and Offloading (FPSO) Vessels in Brazil
  7. Petrobras on the FPSO P-71 and the development of Tupi
  8. Sembcorp Marine’s Brazilian Yard Secures Modification Work on Tupi B.V. FPSO P-71 for Deployment at Itapu Field
  9. Petrobras on the start of P-71 production