Difference between revisions of "P-67 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Name: P 67 FPSO | * Name: P 67 FPSO | ||
Line 6: | Line 6: | ||
* Ownership: | * Ownership: | ||
* Website: | * Website: | ||
+ | * Field: [[Lula Oil Field]] | ||
* Field Operated By: Petrobras | * Field Operated By: Petrobras | ||
* Capacity: 150,000 bpd | * Capacity: 150,000 bpd | ||
* Year of Completion: 2019 | * Year of Completion: 2019 | ||
− | + | === Brief Description === | |
− | * The vessel is a new build and | + | * The vessel is a new build and has capacity to process up to 150 thousand barrels of oil and compress up to 6 million m³ of natural gas per day |
− | * It is one of 8 clones | + | * It is one of 8 clones that were built |
− | + | === Contractors === | |
− | * | + | * '''Engevix Engenharia:''' Construction of the hull |
− | * | + | * '''Dresser-Rand:''' Supply of compressor trains |
− | * | + | * '''Sulzer:''' Pump packages for seawater lift, water injection and auxiliary services |
− | + | === Status === | |
* In operation | * In operation | ||
− | + | === History === | |
* 2010 - Engevix Engenharia awarded contract for the hull | * 2010 - Engevix Engenharia awarded contract for the hull | ||
* 2011 - Dresser-Rand awarded compression equipment and services contract | * 2011 - Dresser-Rand awarded compression equipment and services contract | ||
* 2019 - Vessel began operations | * 2019 - Vessel began operations | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:execution-of-contract-for-the-construction-of-pre-sa Execution of Contract for the construction of pre-salt platforms] | # [http://killajoules.wikidot.com/archive:execution-of-contract-for-the-construction-of-pre-sa Execution of Contract for the construction of pre-salt platforms] | ||
# [http://killajoules.wikidot.com/archive:dresser-rand-selected-to-supply-more-than-700-millio Dresser-Rand Selected to Supply More Than $700 Million of Compression Systems and Related Maintenance Services for Eight FPSO] | # [http://killajoules.wikidot.com/archive:dresser-rand-selected-to-supply-more-than-700-millio Dresser-Rand Selected to Supply More Than $700 Million of Compression Systems and Related Maintenance Services for Eight FPSO] | ||
# [http://killajoules.wikidot.com/blog:4460 Sulzer Pumps to Supply 42 Pumps to Two Floating Production Storage and Offloading (FPSO) Vessels in Brazil] | # [http://killajoules.wikidot.com/blog:4460 Sulzer Pumps to Supply 42 Pumps to Two Floating Production Storage and Offloading (FPSO) Vessels in Brazil] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/petrobras-starts-production-of-p-67.html Petrobras Starts Production of P-67 Platform in Lula Field, in the Santos Basin Pre-Salt] | ||
+ | |||
+ | [[Category:FSPO]] | ||
+ | [[Category:Brazil]] | ||
+ | [[Category:Petrobras]] |
Latest revision as of 08:20, 7 May 2024
Contents
Summary Information
- Name: P 67 FPSO
- Field: Petrobras
- Country: Brazil
- Ownership:
- Website:
- Field: Lula Oil Field
- Field Operated By: Petrobras
- Capacity: 150,000 bpd
- Year of Completion: 2019
Brief Description
- The vessel is a new build and has capacity to process up to 150 thousand barrels of oil and compress up to 6 million m³ of natural gas per day
- It is one of 8 clones that were built
Contractors
- Engevix Engenharia: Construction of the hull
- Dresser-Rand: Supply of compressor trains
- Sulzer: Pump packages for seawater lift, water injection and auxiliary services
Status
- In operation
History
- 2010 - Engevix Engenharia awarded contract for the hull
- 2011 - Dresser-Rand awarded compression equipment and services contract
- 2019 - Vessel began operations
Other Information
- -
Links
- Execution of Contract for the construction of pre-salt platforms
- Dresser-Rand Selected to Supply More Than $700 Million of Compression Systems and Related Maintenance Services for Eight FPSO
- Sulzer Pumps to Supply 42 Pumps to Two Floating Production Storage and Offloading (FPSO) Vessels in Brazil
- Petrobras Starts Production of P-67 Platform in Lula Field, in the Santos Basin Pre-Salt