Difference between revisions of "Oman LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Oman State, Shell, Total, Korea LNG, Mitsubishi * Website: http://www.omanlng.com/ * Location: Oman * Capacity: 6.6 million tons/annum * St...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Oman State, Shell, Total, Korea LNG, Mitsubishi | * Ownership: Oman State, Shell, Total, Korea LNG, Mitsubishi | ||
Line 7: | Line 7: | ||
* Status: In Operation | * Status: In Operation | ||
− | + | === Brief Description === | |
− | * A | + | * A liquefaction plant with two trains, Oman LNG 1 and Oman LNG 2 which have 3.3 million tons capacity each |
− | + | === Technical Details === | |
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** **Chiyoda:** | |
− | + | *** E.P.C.M. for Trains 1&2 | |
− | + | *** Acid Gas Removal EPCM | |
− | + | *** Storage & Loading Facilities - EPC | |
− | * Licensor: [[ | + | * Licensor: [[LNG Terminals Using Air Products Technology | Air Products]] |
− | + | === History === | |
− | * 2000 - Terminal operations began | + | * 2000 - Terminal operations began from train 1 |
+ | * 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC) | ||
+ | * 2005 - First cargo is shipped from the terminal to Spain | ||
+ | * 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG | ||
− | + | === Ongoing Projects/Project Status === | |
* - | * - | ||
− | + | === Suppliers / Customers === | |
− | * | + | ** Among the fields supplying the terminal are the [[Saih Nihayda Gas And Condensate Field]], the [[Barik Gas Field]] and the [[Saih Rawl Gas Field]] |
* Customers: | * Customers: | ||
− | + | ** Customers include Union Fenosa Gas 1.65 mtpa, Mitsubishi Corporation 0.8 mtpa | |
− | + | ** In April 2000, it started to supply approx. 4 million tons annually to the Korea Gas Corporation. | |
+ | ** In October 2000, it began supplying approximately 700,000 tons annually to the Osaka Gas Company, Ltd. | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
− | # [[[Chiyoda LNG References | + | # [http://www.qalhatlng.com/aboutus_qlng_profile.shtml Terminal Profile] |
+ | # [[DYWIDAG LNG Tank References]] | ||
+ | # [[Chiyoda LNG References]] | ||
# [http://www.eni.com/en_IT/company/operations-strategies/gas-power/gas-country-oman.shtml ENI in Oman] | # [http://www.eni.com/en_IT/company/operations-strategies/gas-power/gas-country-oman.shtml ENI in Oman] | ||
# [http://www.mitsubishicorp.com/jp/en/bg/energy/dgas_b/uoman.html Information from Mitsubishi] | # [http://www.mitsubishicorp.com/jp/en/bg/energy/dgas_b/uoman.html Information from Mitsubishi] | ||
+ | # [http://killajoules.wikidot.com/archive:chiyoda-secured-lng-train-epc-contract-in-oman Chiyoda Secured LNG Train EPC Contract in Oman] | ||
+ | # [http://killajoules.wikidot.com/archive:chiyoda-foster-wheeler-secures-lng-train-epc-contrac Chiyoda-Foster Wheeler Secures LNG Train EPC Contract in the Sultanate of Oman] | ||
+ | # [http://killajoules.wikidot.com/archive:acquisition-of-equity-interest-in-qalhat-lng Acquisition of Equity Interest in Qalhat LNG] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Oman]] | ||
+ | [[category:Shell]] |
Revision as of 17:27, 28 April 2024
Contents
Summary Information
- Ownership: Oman State, Shell, Total, Korea LNG, Mitsubishi
- Website: http://www.omanlng.com/
- Location: Oman
- Capacity: 6.6 million tons/annum
- Status: In Operation
Brief Description
- A liquefaction plant with two trains, Oman LNG 1 and Oman LNG 2 which have 3.3 million tons capacity each
Technical Details
- Storage capacity:
- Constructor:
- **Chiyoda:**
- E.P.C.M. for Trains 1&2
- Acid Gas Removal EPCM
- Storage & Loading Facilities - EPC
- **Chiyoda:**
- Licensor: Air Products
History
- 2000 - Terminal operations began from train 1
- 2003 - Chiyoda-Foster Wheeler was awarded a contract by Ministry of Oil and Gas for the detailed engineering, procurement and construction (EPC)
- 2005 - First cargo is shipped from the terminal to Spain
- 2006 - Itochu Corporation, Mitsubishi Corporation, and Osaka Gas reached an agreement for a partial equity acquisition of Qalhat LNG
Ongoing Projects/Project Status
- -
Suppliers / Customers
- Among the fields supplying the terminal are the Saih Nihayda Gas And Condensate Field, the Barik Gas Field and the Saih Rawl Gas Field
- Customers:
- Customers include Union Fenosa Gas 1.65 mtpa, Mitsubishi Corporation 0.8 mtpa
- In April 2000, it started to supply approx. 4 million tons annually to the Korea Gas Corporation.
- In October 2000, it began supplying approximately 700,000 tons annually to the Osaka Gas Company, Ltd.
Other Information
- -