Difference between revisions of "Numaligarh Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Numaligarh Refinery Limited (NRL) Website: http://www.nrl.co.in/ Location: Numaligarh in the district of Golaghat (Assam), India Capacity: 3.0 m...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Numaligarh Refinery Limited (NRL)
+
* Ownership: Numaligarh Refinery Limited (NRL)
Website: http://www.nrl.co.in/
+
* Website: http://www.nrl.co.in/
Location: Numaligarh in the district of Golaghat (Assam), India
+
* Location: Numaligarh in the district of Golaghat (Assam), India
Capacity: 3.0 million tons/annum & bbl/day
+
* Capacity: 3.0 million tons/annum & bbl/day
Nelson Complexity:
+
* * Nelson Complexity:
 
Refining Depth:
 
Refining Depth:
Brief Description
+
=== Brief Description ===
A small but complex refinery
+
* A small but complex refinery
Refining Units
+
=== Refining Units ===
Atmospheric Distillation
+
* Atmospheric Distillation
Vacuum distillation unit
+
* Vacuum distillation unit
Delayed Coker
+
* Delayed Coker
Hydrocracker
+
* Hydrocracker
Hydrogen Unit
+
* Hydrogen Unit
Naphtha Hydrotreater
+
* * Naphtha Hydrotreater
 
Catalytic reformer
 
Catalytic reformer
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil:
+
* Crude Oil:
Refined Products:
+
* Refined Products:
Crude Supply
+
=== Crude Supply ===
 
-
 
-
Products Produced
+
=== Products Produced ===
PG, Naphtha, Motor Spirit ( MS), Aviation Turbine Fuel ( ATF)Superior Kerosene Oil ( SKO)High Speed Diesel (HSD), Raw Petroleum Coke ( RPC ) Calcined Petroleum Coke ( CPC) & Sulphur
+
* PG, Naphtha, Motor Spirit ( MS), Aviation Turbine Fuel ( ATF)Superior Kerosene Oil ( SKO)High Speed Diesel (HSD), Raw Petroleum Coke ( RPC ) Calcined Petroleum Coke ( CPC) & Sulphur
Ongoing Projects
+
=== Projects ===
The refinery is being expanded to 9.0 million tons oer annum
+
* The refinery is being expanded to 9.0 million tons oer annum
See Numaligarh Refinery Expansion Project
+
* See [[Numaligarh Refinery Expansion Project]]
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
1999 - Refinery commissioned
+
* 1999 - Refinery commissioned
2006 - Naphtha Hydrotreater and Catalytic reformer commissioned
+
* 2006 - Naphtha Hydrotreater and Catalytic reformer commissioned
2007 - Euro III Diesel project completed
+
* 2007 - Euro III Diesel project completed
2011 - Diesel Quality Upgradation Project completed
+
* 2011 - Diesel Quality Upgradation Project completed
2019 - Government makes FID on expansion project
+
* 2019 - Government makes FID on expansion project
Relevant Links
+
=== Links ===
First batch of Euro III MS Dispatched By NRL: Toyo India was PMC
+
# [http://www.toyoindia.com/news_events/display_news_archive_title_info.asp?Topic_Random_No=1189976 First batch of Euro III MS Dispatched By NRL: Toyo India was PMC]
Engineers India Refining References
+
# [[[Engineers India Refining References]]]
Union Cabinet clears Numaligarh Refinery Expansion Proposal Highest ever investment in North East India at Rs. 22,594 Crore
+
# [http://killajoules.wikidot.com/blog:6150 Union Cabinet clears Numaligarh Refinery Expansion Proposal Highest ever investment in North East India at Rs. 22,594 Crore]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:India]]

Revision as of 14:23, 24 March 2020

Summary Information

  • Ownership: Numaligarh Refinery Limited (NRL)
  • Website: http://www.nrl.co.in/
  • Location: Numaligarh in the district of Golaghat (Assam), India
  • Capacity: 3.0 million tons/annum & bbl/day
  • * Nelson Complexity:

Refining Depth:

Brief Description

  • A small but complex refinery

Refining Units

  • Atmospheric Distillation
  • Vacuum distillation unit
  • Delayed Coker
  • Hydrocracker
  • Hydrogen Unit
  • * Naphtha Hydrotreater

Catalytic reformer

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • PG, Naphtha, Motor Spirit ( MS), Aviation Turbine Fuel ( ATF)Superior Kerosene Oil ( SKO)High Speed Diesel (HSD), Raw Petroleum Coke ( RPC ) Calcined Petroleum Coke ( CPC) & Sulphur

Projects

Other Information

-

History

  • 1999 - Refinery commissioned
  • 2006 - Naphtha Hydrotreater and Catalytic reformer commissioned
  • 2007 - Euro III Diesel project completed
  • 2011 - Diesel Quality Upgradation Project completed
  • 2019 - Government makes FID on expansion project

Links

  1. First batch of Euro III MS Dispatched By NRL: Toyo India was PMC
  2. [[[Engineers India Refining References]]]
  3. Union Cabinet clears Numaligarh Refinery Expansion Proposal Highest ever investment in North East India at Rs. 22,594 Crore