Difference between revisions of "Moscow Refinery Deep Refining Complex Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Gazprom Neft |
− | * Website: | + | * Website: http://www.gazprom-neft.com/ |
− | * Wiki Page: | + | * Wiki Page: [[Moscow Refinery]] |
− | * Location: | + | * Location: Moscow, Russia |
* Capacity: million tons/annum & 00,000 bbl/day | * Capacity: million tons/annum & 00,000 bbl/day | ||
* Nelson Complexity: | * Nelson Complexity: | ||
− | * Project Stage: | + | * Project Stage: Under construction |
− | * Expected Completion: | + | * Expected Completion: [[Refinery Projects to be completed in 2024 | 2024]] |
* Budget: | * Budget: | ||
+ | |||
=== The Project === | === The Project === | ||
* Project Type: Upgrade | * Project Type: Upgrade | ||
* Project Summary: Addition of a delayed coker and hydrocracker complex | * Project Summary: Addition of a delayed coker and hydrocracker complex | ||
* Main Contractors | * Main Contractors | ||
+ | ** CC7: The general construction contract | ||
** Técnicas Reunidas: detail design of the delayed coker, materials and equipment purchase, new unit construction management and start-up | ** Técnicas Reunidas: detail design of the delayed coker, materials and equipment purchase, new unit construction management and start-up | ||
+ | ** DL E&C: detail design of the hydrocracker, materials and equipment purchase, new unit construction management and start-up | ||
* Licences | * Licences | ||
− | ** | + | ** Lummus: Delayed Coker and 2 furnaces |
=== Refining Units === | === Refining Units === | ||
− | * | + | * Delayed Coking Unit (DCU) |
+ | * Hydrocracking Unit (HCU), | ||
+ | * Hydrogen Production Unit (HPU) | ||
+ | |||
=== Terminal Capacity === | === Terminal Capacity === | ||
* Crude Oil: | * Crude Oil: | ||
Line 25: | Line 31: | ||
- | - | ||
=== Products Produced === | === Products Produced === | ||
− | + | * The project will reduce the production of residual products and increase middle distillates | |
+ | |||
=== History === | === History === | ||
− | * | + | * 2021 - Construction contracts were awarded |
+ | |||
=== Other Information === | === Other Information === | ||
- | - | ||
=== Links === | === Links === | ||
− | # [https://refiningnews.blogspot.com/2021/06/tecnicas-reunidas-gets-240-million.html Técnicas Reunidas gets a $240 million contract in Russia ] | + | # [https://refiningnews.blogspot.com/2021/06/tecnicas-reunidas-gets-240-million.html Técnicas Reunidas gets a $240 million contract in Russia] |
+ | # [https://refiningnews.blogspot.com/2021/06/gazprom-neft-to-collaborate-with-spains.html Gazprom Neft to collaborate with Spain’s Tecnicas Reunidas S.A. in building the deep refining complex at its Moscow Refinery] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/cc7-won-bid-for-aorc-project.html CC7 Won the Bid for AORC Project– Hydrocracking Unit (HCU)/ Hydrogen Production Unit (HPU)] | ||
+ | # [https://refiningnews.blogspot.com/2022/01/lummus-and-moscow-refinery-sign.html Lummus and Moscow Refinery Sign Agreement for Furnace Supply in Russia] |
Latest revision as of 12:12, 11 January 2022
Contents
Summary Information
- Ownership: Gazprom Neft
- Website: http://www.gazprom-neft.com/
- Wiki Page: Moscow Refinery
- Location: Moscow, Russia
- Capacity: million tons/annum & 00,000 bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2024
- Budget:
The Project
- Project Type: Upgrade
- Project Summary: Addition of a delayed coker and hydrocracker complex
- Main Contractors
- CC7: The general construction contract
- Técnicas Reunidas: detail design of the delayed coker, materials and equipment purchase, new unit construction management and start-up
- DL E&C: detail design of the hydrocracker, materials and equipment purchase, new unit construction management and start-up
- Licences
- Lummus: Delayed Coker and 2 furnaces
Refining Units
- Delayed Coking Unit (DCU)
- Hydrocracking Unit (HCU),
- Hydrogen Production Unit (HPU)
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The project will reduce the production of residual products and increase middle distillates
History
- 2021 - Construction contracts were awarded
Other Information
-
Links
- Técnicas Reunidas gets a $240 million contract in Russia
- Gazprom Neft to collaborate with Spain’s Tecnicas Reunidas S.A. in building the deep refining complex at its Moscow Refinery
- CC7 Won the Bid for AORC Project– Hydrocracking Unit (HCU)/ Hydrogen Production Unit (HPU)
- Lummus and Moscow Refinery Sign Agreement for Furnace Supply in Russia