Mondo Oil Field
Revision as of 11:50, 18 October 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Exxon * Country: Angola * Location: Block 15 * Production start: 2008 * Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33% * Typ...")
Summary Information
- Operator: Exxon
- Country: Angola
- Location: Block 15
- Production start: 2008
- Partners: Exxon - 40%, BP - 26.67%, Eni - 20%, Statoil - 13.33%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field is part of the Kizomba C Project, along with the Saxi-Batuque Oil Field
- It utilises the Mondo FPSO with is capable of processing 100,000 barrels of oil per day (bopd) with a storage capacity for 1.6 million barrels of oil
- The development included 17 subsea trees and five manifolds
+++ Contractors
- **Keppel:** Conversion, including installation and integration of the topside modules, installation of an external turret and helideck, fabrication and installation of a flare tower and bow modification work
- **Vetco Gray:** Engineering, procurement and construction (EPC) of 17 subsea trees, five manifolds, topside and subsea control systems and flowline connection systems
+++ History
- 2000 - Mondo oil field discovered
- 2006 - SBM Offshore awarded FPSO lease and operation contract
- 2006 - Vetco Gray awarded subsea contract
- 2007 - FPSO conversion completed
- 2008 - First Oil produced
+++ Geology
+++ Links